*Activities* are follow-up tasks tied to a record in an Odoo database.
|
|
|
|
|
|
|
|
(activities-important)=
|
|
|
|
|
|
|
|
The icon used to display activities varies, depending on the {ref}`activity type
|
2025-02-28 03:47:22 +07:00
|
|
|
<activities-types>`:
|
2025-02-27 18:56:07 +07:00
|
|
|
|
|
|
|
- {icon}`fa-clock-o` {guilabel}`(clock)` icon: the default activities icon.
|
|
|
|
- {icon}`fa-phone` {guilabel}`(phone)` icon: a phone call is scheduled.
|
|
|
|
- {icon}`fa-envelope` {guilabel}`(envelope)` icon: an email is scheduled.
|
|
|
|
- {icon}`fa-check` {guilabel}`(check)` icon: a "to-do" is scheduled.
|
|
|
|
- {icon}`fa-users` {guilabel}`(people)` icon: a meeting is scheduled.
|
|
|
|
- {icon}`fa-upload` {guilabel}`(upload)` icon: a document is scheduled to be uploaded.
|
|
|
|
- {icon}`fa-pencil-square-o` {guilabel}`(request signature)` icon: a signature request is scheduled.
|
|
|
|
|
|
|
|
## Schedule activities
|
|
|
|
|
|
|
|
Activities can be scheduled on any page of the database that contains a {ref}`chatter
|
2025-02-28 03:47:22 +07:00
|
|
|
<activities-chatter>` thread, {ref}`Kanban view <activities-kanban>`, {ref}`list view
|
|
|
|
<activities-list>`, or {ref}`activities view <activities-activity>` of an application.
|
2025-02-27 18:56:07 +07:00
|
|
|
|
|
|
|
(activities-chatter)=
|
|
|
|
|
|
|
|
### Chatter
|
|
|
|
|
|
|
|
Activities can be created from the chatter on any record.
|
|
|
|
|
|
|
|
To schedule a new activity, click the {guilabel}`Activities` button, located at the top of the
|
|
|
|
chatter. In the {guilabel}`Schedule Activity` pop-up window that appears, {ref}`fill out the
|
2025-02-28 03:47:22 +07:00
|
|
|
Schedule Activity form <activities-form>`.
|
2025-02-27 18:56:07 +07:00
|
|
|
|
|
|
|
```{image} activities/chatter.png
|
|
|
|
:align: center
|
|
|
|
:alt: New activity type form.
|
|
|
|
```
|
|
|
|
|
|
|
|
(activities-kanban)=
|
|
|
|
|
|
|
|
### Kanban view
|
|
|
|
|
|
|
|
Activities can also be created from the {icon}`oi-view-kanban` {guilabel}`(Kanban)` view.
|
|
|
|
|
|
|
|
To do so, click on the {{ clock }} located at the bottom of an individual record.
|
|
|
|
|
|
|
|
Click {guilabel}`+ Schedule An Activity`, then proceed to {ref}`fill out the Schedule Activity form
|
2025-02-28 03:47:22 +07:00
|
|
|
<activities-form>`.
|
2025-02-27 18:56:07 +07:00
|
|
|
|
|
|
|
```{image} activities/schedule-kanban-activity.png
|
|
|
|
:align: center
|
|
|
|
:alt: Kanban view of the CRM pipeline and the option to schedule an activity.
|
|
|
|
```
|
|
|
|
|
|
|
|
:::{note}
|
|
|
|
If a record already has a scheduled activity, the {{ clock }} is replaced by the icon that represents
|
|
|
|
the existing scheduled activity. Click on the activity type's icon to schedule another activity.
|
|
|
|
:::
|
|
|
|
|
|
|
|
(activities-list)=
|
|
|
|
|
|
|
|
### List view
|
|
|
|
|
|
|
|
Activities can also be created from a {icon}`oi-view-list` {guilabel}`(list)` view.
|
|
|
|
|
|
|
|
If the {guilabel}`Activities` column is hidden, reveal it using the {icon}`oi-settings-adjust`
|
|
|
|
{guilabel}`(settings adjust)` icon in the far-right of the top row.
|
|
|
|
|
|
|
|
Then, click on the {{ clock }} for the record the activity is being added to, and click {guilabel}`+
|
2025-02-28 03:47:22 +07:00
|
|
|
Schedule an activity`. Proceed to {ref}`fill out the Schedule Activity form <activities-form>` that
|
2025-02-27 18:56:07 +07:00
|
|
|
appears.
|
|
|
|
|
|
|
|
:::{note}
|
|
|
|
If a record already has a scheduled activity, the {{ clock }} is replaced by the icon that represents
|
|
|
|
the existing scheduled activity. Click on the activity type's icon to schedule another activity.
|
|
|
|
:::
|
|
|
|
|
|
|
|
```{image} activities/schedule-list-activity.png
|
|
|
|
:align: center
|
|
|
|
:alt: List view of the CRM pipeline and the option to schedule an activity.
|
|
|
|
```
|
|
|
|
|
|
|
|
(activities-activity)=
|
|
|
|
|
|
|
|
### Activity view
|
|
|
|
|
|
|
|
Most applications in Odoo have an *Activity* view available. If available, a {{ clock }} is visible in
|
|
|
|
the top-right corner of the main menu bar, amongst the other view option icons.
|
|
|
|
|
|
|
|
To open the activity view, click the {{ clock }}.
|
|
|
|
|
|
|
|
```{image} activities/activities.png
|
|
|
|
:align: center
|
|
|
|
:alt: Top-right menu with the Activities icon called out.
|
|
|
|
```
|
|
|
|
|
|
|
|
In this view, all the available activities are listed in the columns, while the horizontal entries
|
|
|
|
represent all the individual records.
|
|
|
|
|
|
|
|
Activities that appear green have a due date in the future, activities that appear orange are due
|
|
|
|
today, while activities appearing red are overdue.
|
|
|
|
|
|
|
|
Color bars in each column represent records for specific activity types, and display a number
|
|
|
|
indicating how many activities are scheduled for that type.
|
|
|
|
|
|
|
|
If multiple activity types are scheduled for a record, a number appears in the box, indicating the
|
|
|
|
total number of scheduled activities.
|
|
|
|
|
|
|
|
:::{note}
|
|
|
|
Activity colors, and their relation to an activity's due date, are consistent throughout Odoo,
|
|
|
|
regardless of the activity type, or the view.
|
|
|
|
:::
|
|
|
|
|
|
|
|
To schedule an activity for a record, hover over the corresponding field. Click the {icon}`fa-plus`
|
|
|
|
{guilabel}`(plus)` icon that appears, and then {ref}`fill out the Schedule Activity form
|
2025-02-28 03:47:22 +07:00
|
|
|
<activities-form>`.
|
2025-02-27 18:56:07 +07:00
|
|
|
|
|
|
|
```{image} activities/activity-view.png
|
|
|
|
:align: center
|
|
|
|
:alt: Activity view of the CRM pipeline and the option to schedule an activity.
|
|
|
|
```
|
|
|
|
|
|
|
|
(activities-form)=
|
|
|
|
|
|
|
|
### Schedule Activity form
|
|
|
|
|
|
|
|
Activities can be scheduled from many different places, such as from the {ref}`chatter
|
2025-02-28 03:47:22 +07:00
|
|
|
<activities-chatter>` of a record, or from one of multiple views in an application, when available:
|
|
|
|
the {ref}`Kanban view <activities-kanban>`, {ref}`list view <activities-list>`, or {ref}`activity
|
|
|
|
view <activities-activity>`.
|
2025-02-27 18:56:07 +07:00
|
|
|
|
|
|
|
Enter the following information on the form:
|
|
|
|
|
|
|
|
- {guilabel}`Activity Type`: select the type of activity from the drop-down menu. The default
|
|
|
|
options are: {guilabel}`Email`, {guilabel}`Call`, {guilabel}`Meeting`, or {guilabel}`To-Do`.
|
|
|
|
Depending on what other applications are installed, additional options may be available.
|
|
|
|
- {guilabel}`Summary`: enter a short title for the activity, such as `Discuss Proposal`.
|
|
|
|
- {guilabel}`Due Date`: using the calendar popover, select the activity's deadline.
|
|
|
|
- {guilabel}`Assigned to`: by default, the current user populates this field. To assign a different
|
|
|
|
user to the activity, select them from the drop-down menu.
|
|
|
|
- {guilabel}`Notes`: add any additional information for the activity in this field.
|
|
|
|
|
|
|
|
When the {guilabel}`Schedule Activity` pop-up window is completed, click one of the following
|
|
|
|
buttons:
|
|
|
|
|
|
|
|
- {guilabel}`Open Calendar`: opens the user's calendar to add and schedule the activity.
|
|
|
|
|
|
|
|
Click on the desired date and time for the activity, and a {guilabel}`New Event` pop-up window
|
|
|
|
appears. The summary from the *Schedule Activity* pop-up window populates the {guilabel}`Title`
|
|
|
|
field.
|
|
|
|
|
|
|
|
Enter the information in the {guilabel}`New Event` pop-up window, then click {guilabel}`Save &
|
|
|
|
Close` to schedule it. Once scheduled, the activity is added to the chatter under the
|
|
|
|
{guilabel}`Planned Activities` section.
|
|
|
|
|
|
|
|
:::{important}
|
|
|
|
The {guilabel}`Open Calendar` button **only** appears if the {guilabel}`Activity Type` is set
|
|
|
|
to either {guilabel}`Call` or {guilabel}`Meeting`.
|
|
|
|
:::
|
|
|
|
|
|
|
|
- {guilabel}`Schedule`: schedules the activity, and adds the activity to the chatter under
|
|
|
|
{guilabel}`Planned Activities`.
|
|
|
|
|
|
|
|
- {guilabel}`Schedule & Mark as Done`: adds the details of the activity to the chatter under
|
|
|
|
{guilabel}`Today`. The activity is not scheduled, and is automatically marked as done.
|
|
|
|
|
|
|
|
- {guilabel}`Done & Schedule Next`: adds the details of the activity to the chatter under
|
|
|
|
{guilabel}`Today`. The activity is not scheduled, is automatically marked as done, and a new
|
|
|
|
{guilabel}`Schedule Activity` pop-up window appears.
|
|
|
|
|
|
|
|
- {guilabel}`Cancel`: discards any changes made on the {guilabel}`Schedule Activity` pop-up window.
|
|
|
|
|
|
|
|
```{image} activities/schedule-pop-up.png
|
|
|
|
:align: center
|
|
|
|
:alt: View of CRM leads and the option to schedule an activity.
|
|
|
|
```
|
|
|
|
|
|
|
|
(activities-all)=
|
|
|
|
|
|
|
|
## All scheduled activities
|
|
|
|
|
|
|
|
To view a consolidated list of activities, organized by application, click the {{ clock }} in the header
|
|
|
|
menu, located in the top-right corner.
|
|
|
|
|
|
|
|
If any activities are scheduled, the number of activities appear in a red bubble on the
|
|
|
|
{{ clock }}.
|
|
|
|
|
|
|
|
All activities for each application are further divided into subsections, indicating where in the
|
|
|
|
application the activity is to be completed. Each sub-section lists the number of scheduled
|
|
|
|
activities that are {guilabel}`Late`, due {guilabel}`Today`, and scheduled in the
|
|
|
|
{guilabel}`Future`.
|
|
|
|
|
|
|
|
```{eval-rst}
|
|
|
|
.. example::
|
|
|
|
In the *Time Off* application, one activity is scheduled to be done in the *All Time Off*
|
|
|
|
requests dashboard, and six activities are scheduled to be done in the *Allocations* dashboard.
|
|
|
|
|
|
|
|
These requests appear in two separate lists in the all activities drop-down menu: one labeled
|
|
|
|
`Time Off` and one labeled `Time Off Allocation`.
|
|
|
|
|
|
|
|
.. image:: activities/activities-menu.png
|
|
|
|
:align: center
|
|
|
|
:alt: The list of activities that is accessed from the main menu bar. Two entries for the Time
|
|
|
|
Off application are highlighted.
|
|
|
|
```
|
|
|
|
|
|
|
|
### Request a document
|
|
|
|
|
|
|
|
The option to {guilabel}`Request a Document` is available at the bottom of the list of {ref}`all
|
2025-02-28 03:47:22 +07:00
|
|
|
scheduled activities <activities-all>`, the option to {guilabel}`Request a Document` appears. Click
|
2025-02-27 18:56:07 +07:00
|
|
|
{guilabel}`Request a Document`, and a {guilabel}`Request a file` pop-up window appears.
|
|
|
|
|
|
|
|
Enter the following information on the form:
|
|
|
|
|
|
|
|
- {guilabel}`Document Name`: enter a name for the document being requested.
|
|
|
|
- {guilabel}`Request To`: select the user the document is being requested from using the drop-down
|
|
|
|
menu.
|
|
|
|
- {guilabel}`Due Date In`: enter a numerical value indicating when the document is due. Next to
|
|
|
|
this field, a {guilabel}`Days` field is visible. Click {guilabel}`Days`, the default option, to
|
|
|
|
reveal a drop-down menu. Select the desired time-frame option from the list. The options are
|
|
|
|
{guilabel}`Days`, {guilabel}`Weeks`, or {guilabel}`Months`.
|
|
|
|
- {guilabel}`Workspace`: using the drop-down menu, select the specific {ref}`Workspace
|
2025-02-28 03:47:22 +07:00
|
|
|
<documents-workspaces>` the document is being uploaded to.
|
2025-02-27 18:56:07 +07:00
|
|
|
- {guilabel}`Tags`: select any desired tags from the drop-down menu. The available tags displayed
|
|
|
|
are based on the tags configured for the selected {guilabel}`Workspace`.
|
|
|
|
- {guilabel}`Message`: enter a message to clarify the document request in this field.
|
|
|
|
|
|
|
|
When all the fields are completed, click {guilabel}`Request` to send the document request.
|
|
|
|
|
|
|
|
```{image} activities/request-doc.png
|
|
|
|
:align: center
|
|
|
|
:alt: The Request a file form, with all fields filled out to request a contract.
|
|
|
|
```
|
|
|
|
|
|
|
|
(activities-types)=
|
|
|
|
|
|
|
|
## Activity types
|
|
|
|
|
|
|
|
To view the currently configured types of activities in the database, navigate to
|
|
|
|
{menuselection}`Settings app --> Discuss section --> Activities setting --> Activity Types`.
|
|
|
|
|
|
|
|
```{image} activities/settings-activities-types.png
|
|
|
|
:align: center
|
|
|
|
:alt: Activity Types button in the Settings application under the Discuss section.
|
|
|
|
```
|
|
|
|
|
|
|
|
Doing so reveals the {guilabel}`Activity Types` page, where the existing activity types are found.
|
|
|
|
|
|
|
|
:::{tip}
|
|
|
|
Individual applications have a list of *Activity Types* dedicated to that application. For
|
|
|
|
example, to view and edit the activities available for the *CRM* application, go to
|
|
|
|
{menuselection}`CRM app --> Configuration --> Activity Types`.
|
|
|
|
:::
|
|
|
|
|
|
|
|
```{image} activities/activity-list.png
|
|
|
|
:align: center
|
|
|
|
:alt: The list of activity types already configured and available.
|
|
|
|
```
|
|
|
|
|
|
|
|
### Edit activity types
|
|
|
|
|
2025-02-28 03:47:22 +07:00
|
|
|
To edit an existing {ref}`activity type <activities-types>`, click on the activity type, and the
|
2025-02-27 18:56:07 +07:00
|
|
|
activity type form loads.
|
|
|
|
|
|
|
|
Make any desired changes to the activity type form. The form automatically saves, but it can be
|
|
|
|
saved manually at any time by clicking the {guilabel}`Save Manually` option, represented by a
|
|
|
|
{icon}`fa-cloud-upload` {guilabel}`(cloud upload)` icon, located in the top-left corner of the page.
|
|
|
|
|
|
|
|
### Create new activity types
|
|
|
|
|
2025-02-28 03:47:22 +07:00
|
|
|
To create a new {ref}`activity type <activities-types>`, click {guilabel}`New` from the
|
2025-02-27 18:56:07 +07:00
|
|
|
{guilabel}`Activity Types` page, and a blank activity type form loads.
|
|
|
|
|
|
|
|
Enter a {guilabel}`Name` for the activity type at the top of the form, then enter the following
|
|
|
|
information on the form.
|
|
|
|
|
|
|
|
#### Activity Settings section
|
|
|
|
|
|
|
|
- {guilabel}`Action`: using the drop-down menu, select an action associated with this new activity
|
|
|
|
type. Some actions trigger specific behaviors after an activity is scheduled, such as:
|
|
|
|
|
|
|
|
- {guilabel}`Upload Document`: if selected, a link to upload a document is automatically added to
|
|
|
|
the planned activity in the chatter.
|
|
|
|
- {guilabel}`Call` or {guilabel}`Meeting`: if selected, users have the option to open their
|
|
|
|
calendar to select a date and time for the activity.
|
|
|
|
- {guilabel}`Request Signature`: if selected, a link to open a signature request pop-up window is
|
|
|
|
automatically added to the planned activity in the chatter. This requires the Odoo *Sign*
|
|
|
|
application to be installed.
|
|
|
|
|
|
|
|
:::{note}
|
|
|
|
Available activity types vary based on the installed applications in the database.
|
|
|
|
:::
|
|
|
|
|
2025-02-28 03:47:22 +07:00
|
|
|
- {guilabel}`Folder`: select a specific {ref}`workspace <documents-workspaces>` folder to save a
|
2025-02-27 18:56:07 +07:00
|
|
|
document to. This field **only** appears if {guilabel}`Upload Document` is selected for the
|
|
|
|
{guilabel}`Action`.
|
|
|
|
|
|
|
|
Using the drop-down menu, select the {guilabel}`Folder` the document is saved to.
|
|
|
|
|
|
|
|
- {guilabel}`Default User`: select a user from the drop-down menu to automatically assign this
|
|
|
|
activity to the selected user when this activity type is scheduled. If this field is left blank,
|
|
|
|
the activity is assigned to the user who creates the activity.
|
|
|
|
|
|
|
|
- {guilabel}`Default Summary`: enter a note to include whenever this activity type is created.
|
|
|
|
|
|
|
|
:::{note}
|
|
|
|
The information in the {guilabel}`Default User` and {guilabel}`Default Summary` fields are
|
|
|
|
included when an activity is created. However, they can be altered before the activity is
|
|
|
|
scheduled or saved.
|
|
|
|
:::
|
|
|
|
|
|
|
|
- {guilabel}`Keep Done`: tick this checkbox to keep activities that have been marked as `Done`
|
2025-02-28 03:47:22 +07:00
|
|
|
visible in the {ref}`activity view <activities-activity>`.
|
2025-02-27 18:56:07 +07:00
|
|
|
|
|
|
|
- {guilabel}`Default Note`: enter any notes to appear with the activity.
|
|
|
|
|
|
|
|
#### Next Activity section
|
|
|
|
|
|
|
|
It is possible to have another activity either suggested or triggered. To do so, configure the
|
|
|
|
{guilabel}`Next Activity` section.
|
|
|
|
|
|
|
|
- {guilabel}`Chaining Type`: select either {guilabel}`Suggest Next Activity` or {guilabel}`Trigger
|
|
|
|
Next Activity` from the drop-down menu. Depending on the selected option, either the
|
|
|
|
{guilabel}`Suggest` or {guilabel}`Trigger` field is displayed.
|
|
|
|
|
|
|
|
:::{note}
|
|
|
|
The {guilabel}`Chaining Type` field does **not** appear if {guilabel}`Upload Document` is
|
|
|
|
selected for the {guilabel}`Action`.
|
|
|
|
:::
|
|
|
|
|
|
|
|
- {guilabel}`Suggest/Trigger`: depending on what is selected for the {guilabel}`Chaining Type`, this
|
|
|
|
field either displays {guilabel}`Suggest` or {guilabel}`Trigger`. Using the drop-down menu, select
|
|
|
|
the activity to recommend or schedule as a follow-up task to the activity type.
|
|
|
|
|
|
|
|
- {guilabel}`Schedule`: configure when the next activity is suggested or triggered.
|
|
|
|
|
|
|
|
First, enter a numerical value indicating when the activity is suggested or triggered.
|
|
|
|
|
|
|
|
Next to this field, a {guilabel}`Days` field is visible. Click {guilabel}`Days`, the default
|
|
|
|
option, to reveal a drop-down menu. Select the desired time-frame option from the list. The
|
|
|
|
options are {guilabel}`Days`, {guilabel}`Weeks`, or {guilabel}`Months`.
|
|
|
|
|
|
|
|
Lastly, using the drop-down menu, select whether the activity is scheduled or triggered either
|
|
|
|
{guilabel}`after previous activity deadline` or {guilabel}`after completion date`.
|
|
|
|
|
|
|
|
```{image} activities/new-activity.png
|
|
|
|
:align: center
|
|
|
|
:alt: A new Activity form with all the fields filled out.
|
|
|
|
```
|
|
|
|
|
|
|
|
:::{seealso}
|
|
|
|
- {doc}`../productivity/discuss`
|
|
|
|
- {doc}`../productivity/discuss/team_communication`
|
|
|
|
- {doc}`../sales/crm/optimize/utilize_activities`
|
|
|
|
:::
|
|
|
|
|