[ADD] manufactuting: How to process a manufacturing order
This commit is contained in:
parent
3cc76159ae
commit
05391af089
@ -8,3 +8,4 @@ How to consume composents to make a finished product
|
||||
:titlesonly:
|
||||
|
||||
getting_started/bill_configuration
|
||||
getting_started/manufacturing_order
|
@ -1,6 +1,6 @@
|
||||
====================================
|
||||
How to Configure a Bill of Materials
|
||||
====================================
|
||||
=================================
|
||||
How to create a Bill of Materials
|
||||
=================================
|
||||
|
||||
A bill of materials (BoM) is a document that describes the component
|
||||
products, the quantity of each component, and the process required to
|
||||
|
@ -0,0 +1,56 @@
|
||||
====================================
|
||||
How to process a manufacturing order
|
||||
====================================
|
||||
|
||||
Introduction
|
||||
============
|
||||
|
||||
There are two basic ways to manage manufacturing in Odoo. The first way
|
||||
manages work with one document only. This document is the
|
||||
**manufacturing order**. The second way uses additional documents to
|
||||
give you more precise control over the manufacturing process. In this
|
||||
way, **Manufacturing orders** are divided into one or more steps
|
||||
defined by **work orders**, performed in an order defined by
|
||||
**routings**.
|
||||
|
||||
How to manage manufacturing without routings
|
||||
============================================
|
||||
|
||||
You will most likely use manufacturing orders without routings if all
|
||||
the work to produce your product is performed in one place, by one
|
||||
person, in one step, and/or you do not need the level of granular
|
||||
control afforded by work orders and routings.
|
||||
|
||||
Managing your operations in this way is the default behavior in Odoo.
|
||||
There are two basic phases from planning to production:
|
||||
|
||||
1. Create manufacturing orders
|
||||
|
||||
2. Record Production
|
||||
|
||||
How to manage manufacturing with routings and work orders
|
||||
=========================================================
|
||||
|
||||
To use work orders and routings, you will need to enable the option
|
||||
**Manage production by work orders** From
|
||||
:menuselection:`Configuration --> Settings`. You will then be able to add
|
||||
routings to bills of materials, and configure some additional related
|
||||
fields. You will also be able to create **work centers**, the
|
||||
locations at which work orders are performed.
|
||||
|
||||
When manufacturing with routings and work orders, each work order is
|
||||
scheduled individually. You will also have access to time and capacity
|
||||
planning, and reports on costing and efficiency on a work center level.
|
||||
|
||||
Manufacturing using routings can be broken down into several steps. When
|
||||
configuring your BoM, you will need to add a routing defining the
|
||||
component work orders. After planning the manufacturing order, you will
|
||||
have the added step of scheduling work orders.
|
||||
|
||||
The workflow is thus divided into three basic phases, as follows:
|
||||
|
||||
1. Create manufacturing orders
|
||||
|
||||
2. Schedule the associated work orders.
|
||||
|
||||
3. Perform the scheduled work and record production.
|