Merge pull request #398 from odoo/13.0-MRP-use_mps-lau
13.0 mrp use mps lau
@ -15,3 +15,4 @@ Manufacturing Management
|
||||
management/alternative_wc
|
||||
management/unbuild
|
||||
management/subcontracting
|
||||
management/use_mps
|
BIN
manufacturing/management/media/use_mps_01.png
Normal file
After Width: | Height: | Size: 3.1 KiB |
BIN
manufacturing/management/media/use_mps_02.png
Normal file
After Width: | Height: | Size: 3.7 KiB |
BIN
manufacturing/management/media/use_mps_03.png
Normal file
After Width: | Height: | Size: 21 KiB |
BIN
manufacturing/management/media/use_mps_04.png
Normal file
After Width: | Height: | Size: 25 KiB |
BIN
manufacturing/management/media/use_mps_05.png
Normal file
After Width: | Height: | Size: 20 KiB |
BIN
manufacturing/management/media/use_mps_06.png
Normal file
After Width: | Height: | Size: 12 KiB |
BIN
manufacturing/management/media/use_mps_07.png
Normal file
After Width: | Height: | Size: 7.3 KiB |
BIN
manufacturing/management/media/use_mps_08.png
Normal file
After Width: | Height: | Size: 8.1 KiB |
BIN
manufacturing/management/media/use_mps_09.png
Normal file
After Width: | Height: | Size: 2.4 KiB |
125
manufacturing/management/use_mps.rst
Normal file
@ -0,0 +1,125 @@
|
||||
==================================
|
||||
Use the Master Production Schedule
|
||||
==================================
|
||||
|
||||
The Master Production Schedule (MPS) is a valuable tool to plan your
|
||||
production based on your demand forecast.
|
||||
|
||||
Configuration
|
||||
=============
|
||||
|
||||
Go to the *Manufacturing app > Configuration > Settings* and activate
|
||||
the Master Production Schedule feature before hitting save.
|
||||
|
||||
.. image:: media/use_mps_01.png
|
||||
:align: center
|
||||
|
||||
.. tip::
|
||||
In the manufacturing settings, you can define the time range of your MPS (month/week/day) and the number of periods you want to display.
|
||||
|
||||
Now, go in *Planning > Master Production Schedule* and click on add a
|
||||
product. You can now define your safety stock target (= the stock you
|
||||
want to have on hand at the end of the period) and the minimum and
|
||||
maximum quantities to replenish.
|
||||
|
||||
.. image:: media/use_mps_02.png
|
||||
:align: center
|
||||
|
||||
.. tip::
|
||||
The products are ordered in the MPS based on their sequence. You can
|
||||
rearrange that sequence by going on the list of your products and
|
||||
reorganize them with drag and drop.
|
||||
|
||||
.. image:: media/use_mps_03.png
|
||||
:align: center
|
||||
|
||||
In the MPS view, you can decide which information you would like to show
|
||||
by clicking on *rows*. Some fields can be added to the view, such as
|
||||
*Actual demand*, which will show which quantity of products has
|
||||
already been ordered for the period, or *Available to Promise*, which
|
||||
allows you to know what can still be sold during the period (what you
|
||||
plan to replenish - what is already sold during the period). You can
|
||||
also decide to hide some information if it isn’t necessary.
|
||||
|
||||
.. image:: media/use_mps_04.png
|
||||
:align: center
|
||||
|
||||
Estimate your demand and launch replenishment
|
||||
=============================================
|
||||
|
||||
The next step is to estimate the demand for the period. This estimation
|
||||
should be entered in the row *Demand Forecast*. You can easily, at any
|
||||
time, compare the demand forecast with the actual demand (= confirmed
|
||||
sales). The demand forecast for a finished product will impact the
|
||||
indirect demand for its components.
|
||||
|
||||
.. image:: media/use_mps_05.png
|
||||
:align: center
|
||||
|
||||
Then, the quantity to replenish for the different periods will be
|
||||
automatically computed. The replenishments you are supposed to launch
|
||||
based on your lead times (vendor lead time or manufacturing lead time)
|
||||
are displayed in green. You can now launch the replenishment by clicking
|
||||
on the replenish button.
|
||||
|
||||
Depending on the configuration of the product (buy vs. manufacture),
|
||||
requests for quotations or manufacturing orders will be created. You can
|
||||
easily access those by clicking on the *Actual Replenishment* cell.
|
||||
|
||||
.. image:: media/use_mps_06.png
|
||||
:align: center
|
||||
|
||||
.. image:: media/use_mps_07.png
|
||||
:align: center
|
||||
|
||||
In case you manually edit the *To replenish* quantity, a small cross
|
||||
will appear on the left. In case you want to go back to the
|
||||
automatically computed value given by Odoo, you can click the cross.
|
||||
|
||||
.. image:: media/use_mps_08.png
|
||||
:align: center
|
||||
|
||||
Cells color signification
|
||||
=========================
|
||||
|
||||
The cells, which are part of the *To replenish* line, can take
|
||||
different colors depending on the situation:
|
||||
|
||||
- **Green**: quantity of products which should be replenished to
|
||||
reach the expected safety stock considering the demand forecast
|
||||
and the indirect demand forecast.
|
||||
|
||||
- **Grey**: replenishment order has already been generated, and its
|
||||
quantity still matches current data.
|
||||
|
||||
- **Red**: replenishment order has already been generated, and its
|
||||
quantity was too high considering current data.
|
||||
|
||||
- **Orange**: replenishment order has already been generated, and
|
||||
its quantity was too low considering current data.
|
||||
|
||||
The *Forecasted stock* line can also contain red cells, which means
|
||||
the stock will be negative during the period in question.
|
||||
|
||||
What if I have underestimated the demand?
|
||||
-----------------------------------------
|
||||
|
||||
You can still increase the demand forecast. It will impact the quantity
|
||||
to replenish. The cell will become orange, and you’ll be able to launch
|
||||
a new replenishment.
|
||||
|
||||
What if I have overestimated the demand?
|
||||
----------------------------------------
|
||||
|
||||
You can decrease the demand forecast. The cell will become red to inform
|
||||
you that you’ve ordered more than planned. If you’re still able to do
|
||||
it, you can cancel some RFQ or MO manually.
|
||||
|
||||
What if I wrongly added a product to the MPS?
|
||||
---------------------------------------------
|
||||
|
||||
You can easily remove a product from the MPS by clicking the small bin
|
||||
on the right of its name.
|
||||
|
||||
.. image:: media/use_mps_09.png
|
||||
:align: center
|