[FIX] inventory: fix manufacturing lead time section

closes odoo/documentation#9138

Signed-off-by: Brandon Seltenrich (brse) <brse@odoo.com>
This commit is contained in:
Brandon Seltenrich (BRSE) 2024-05-02 15:30:01 -04:00
parent 66fc5639b6
commit 4a066cb017
3 changed files with 31 additions and 11 deletions

View File

@ -2,6 +2,10 @@
Scheduled delivery dates
========================
.. |MOs| replace:: :abbr:`MOs (Manufacturing Orders)`
.. |BoM| replace:: :abbr:`BoM (Bill of Materials)`
.. |BoMs| replace:: :abbr:`BoMs (Bills of Materials)`
Accurately forecasting delivery dates is vital for fulfilling customer expectations. In Odoo, the
*Inventory* app allows for comprehensive lead time configuration, allowing coordination and planning
of manufacturing orders, deliveries, and receptions.
@ -233,7 +237,7 @@ Manufacturing lead times
========================
Lead times can help simplify the procurement process for consumable materials and components used in
manufactured products with bills of materials.
manufactured products with bills of materials (BoMs).
The :abbr:`MO (Manufacturing Order)` deadline, which is the deadline to begin the manufacturing
process to complete the product by the scheduled delivery date, can be determined by configuring the
@ -246,19 +250,35 @@ manufacturing lead times and manufacturing security lead times.
Manufacturing lead time
-----------------------
Configure the manufacturing lead time directly on the product form, by navigating to
:menuselection:`Manufacturing app --> Products --> Products`, and select the desired product.
Manufacturing lead times for products are configured from a product's bill of materials (BoM) form.
In the :guilabel:`Inventory` tab of the product, specify the calendar days needed to the manufacture
the product in the :guilabel:`Manufacturing Lead Time` field.
To add a lead time to a |BoM|, navigate to :menuselection:`Manufacturing app --> Products --> Bills
of Materials`, and select the desired |BoM| to edit.
.. example::
Specify a 14-day :guilabel:`Manufacturing Lead Time` for a product directly in the
:guilabel:`Inventory` tab of the product.
On the |BoM| form, click the :guilabel:`Miscellaneous` tab. Change the value (in days) in the
:guilabel:`Manuf. Lead Time` field to specify the calendar days needed to manufacture the product.
.. image:: scheduled_dates/set-manufacturing.png
:align: center
:alt: View of the manufacturing lead time configuration from the product form.
.. image:: scheduled_dates/scheduled-dates-manuf-lead-time.png
:align: center
:alt: Manuf. Lead Time value specified on a product's Bill of Material form.
.. note::
If the selected |BoM| is a multi-level |BoM|, the manufacturing lead times of the components are
added.
If the |BoM| product is subcontracted, the :guilabel:`Manuf. Lead Time` can be used to determine
the date at which components should be sent to the subcontractor.
Change the value (in days) in the :guilabel:`Days to prepare Manufacturing Order` field to create
and confirm |MOs| in advance, and have enough time to replenish components, or manufacture
semi-finished products.
.. tip::
Clicking :guilabel:`Compute`, located next to the :guilabel:`Days to prepare Manufacturing Order`
field, computes the days required to resupply all components listed on the |BoM| form, either by
buying or manufacturing the components or subassemblies.
*Purchase security lead times* that impact this specific |BoM| are also added to this value.
Establish a :abbr:`MO (Manufacturing Order)` deadline, based on the *expected delivery date*,
indicated in the :guilabel:`Scheduled Date` field of the :abbr:`DO (Delivery Order)`.