[IMP] MRP: Improvement of the subcontracting doc (#648)
Before Width: | Height: | Size: 2.6 KiB After Width: | Height: | Size: 8.8 KiB |
Before Width: | Height: | Size: 12 KiB After Width: | Height: | Size: 2.6 KiB |
Before Width: | Height: | Size: 3.7 KiB After Width: | Height: | Size: 10 KiB |
Before Width: | Height: | Size: 12 KiB After Width: | Height: | Size: 10 KiB |
Before Width: | Height: | Size: 18 KiB After Width: | Height: | Size: 19 KiB |
Before Width: | Height: | Size: 13 KiB After Width: | Height: | Size: 15 KiB |
Before Width: | Height: | Size: 12 KiB After Width: | Height: | Size: 16 KiB |
Before Width: | Height: | Size: 14 KiB After Width: | Height: | Size: 15 KiB |
Before Width: | Height: | Size: 14 KiB After Width: | Height: | Size: 16 KiB |
Before Width: | Height: | Size: 12 KiB After Width: | Height: | Size: 6.3 KiB |
Before Width: | Height: | Size: 7.8 KiB After Width: | Height: | Size: 8.3 KiB |
BIN
manufacturing/management/media/subcontracting_12.png
Normal file
After Width: | Height: | Size: 9.4 KiB |
@ -1,123 +1,232 @@
|
||||
=============================
|
||||
Subcontract the manufacturing
|
||||
=============================
|
||||
==============================
|
||||
Subcontract your Manufacturing
|
||||
==============================
|
||||
|
||||
Some businesses subcontract the production of finished products through
|
||||
subcontractors. This can be easily managed through Odoo.
|
||||
Outsourcing a portion of some or all your company’s manufacturing needs
|
||||
is not easy. To make it work right, you have to:
|
||||
|
||||
- Manage the inventory of raw materials at your subcontractor;
|
||||
- Ship new materials to your subcontractors based on your forecasted
|
||||
demand;
|
||||
- Keep track of manufacturing operations done at the subcontractor
|
||||
location;
|
||||
- Control incoming goods quality;
|
||||
- Control subcontractors bills.
|
||||
|
||||
Here is an example of subcontracting the manufacturing of “C”, which is
|
||||
produced out of raw materials “A” and “B”.
|
||||
|
||||
.. image:: media/subcontracting_01.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
With its subcontracting feature, Odoo helps you handle this flow easily.
|
||||
|
||||
Configuration
|
||||
=============
|
||||
|
||||
Go to the :menuselection:`Manufacturing app --> Configuration --> Settings` and tick the
|
||||
box *Subcontracting*.
|
||||
|
||||
.. image:: media/subcontracting_01.png
|
||||
:align: center
|
||||
|
||||
You can now define subcontracted *Bill of Materials*. Therefore, you need to go to
|
||||
:menuselection:`Manufacturing --> Master Data --> Bill of Materials` and hit *Create*. In this
|
||||
*BoM*, list the components which will be used by the subcontractor to manufacture the subcontracted
|
||||
finished product. Specify that the *BoM* type is *Subcontracting* and define one or
|
||||
several subcontractors who will provide you the product.
|
||||
To use the subcontracting feature, go to :menuselection:`Manufacturing
|
||||
--> Configuration --> Settings` and tick the box *Subcontracting*.
|
||||
|
||||
.. image:: media/subcontracting_02.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
To define if a product must be subcontracted, use a *Bill of Materials
|
||||
(BoM)* of type *Subcontracting*.
|
||||
|
||||
To create a new *BoM*, go to :menuselection:`Manufacturing --> Master
|
||||
Data --> Bill of Materials` and hit create. Then, list the components
|
||||
your subcontractor needs to manufacture the product. For costing
|
||||
purposes, you might want to register all the components, even the ones
|
||||
that are sourced directly from the subcontractor.
|
||||
|
||||
Once you have set the *BoM Type* to *Subcontracting*, specify one or
|
||||
several subcontractors.
|
||||
|
||||
.. image:: media/subcontracting_03.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
And... the configuration part is already done!
|
||||
Basic Subcontracting Flow
|
||||
=========================
|
||||
|
||||
Receive or buy a subcontracted product
|
||||
======================================
|
||||
|
||||
You have two options to trigger the subcontracting of a product:
|
||||
|
||||
- **Option A**: You can buy the subcontracted product from your subcontractor
|
||||
|
||||
- **Option B**: You can directly receive the subcontracted product
|
||||
|
||||
Let’s start with option A (option B is just a simpler version of it).
|
||||
|
||||
Create a new purchase order. The vendor must be a subcontractor. The
|
||||
unit price should be the cost you are paying to the subcontractor for
|
||||
the subcontracting (thus, it’s not necessarily the total cost of the
|
||||
subcontracted product).
|
||||
To let your subcontractor know how many products you need, create and
|
||||
send them purchase orders (PO). To do so, open the *Purchase* app and
|
||||
create a new one. Be sure to send the PO to a vendor that is defined as
|
||||
a subcontractor on the *BoM*.
|
||||
|
||||
.. image:: media/subcontracting_04.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
The validation of the purchase order automatically creates the receipt.
|
||||
Whenever you receive the product, you can validate the receipt. The
|
||||
following stock moves are created:
|
||||
Once the *PO* is validated (1), a pending receipt is created. When the
|
||||
products are received, validate the receipt (2), with the actual
|
||||
quantity received. Then Odoo automatically created several inventory
|
||||
moves:
|
||||
|
||||
- For the components
|
||||
- Consume the components at the subcontractor’s location, based on the
|
||||
*BoM* (3);
|
||||
- Produce finished goods at the subcontractor’s location (4);
|
||||
- Move products from the subcontractor’s location to YourCompany
|
||||
through the validated receipt (5).
|
||||
|
||||
- From Subcontracting To Production
|
||||
Of course, Odoo does all the transactions for you, automatically. Simply
|
||||
control the vendor bill with the usual matching process with the
|
||||
purchase order.
|
||||
|
||||
- For the subcontracted product
|
||||
.. note::
|
||||
The *PO* is optional. If you create a receipt manually, with the right
|
||||
subcontractor, Odoo still performs all the moves. Useful if the
|
||||
subcontractor does not bill a fixed price per item, but rather the time
|
||||
and materials used.
|
||||
|
||||
- From Production to Subcontracting
|
||||
Inventory Valuation
|
||||
===================
|
||||
|
||||
- From Subcontracting to Stock
|
||||
The cost of the manufactured product “C” is defined as:
|
||||
|
||||
The *Subcontracting Location* represents the place where the products
|
||||
are at your subcontractor’s warehouse. It is configured as an internal
|
||||
location, the components that are sent to the subcontractor are still
|
||||
valued in your stock.
|
||||
**C = A + B + s**
|
||||
|
||||
For option B, you can simply create the receipt manually with a partner
|
||||
of type subcontractor defined on it.
|
||||
With:
|
||||
|
||||
Receive or buy a subcontracted product with tracked components
|
||||
==============================================================
|
||||
- **A**: Cost of raw materials coming from YourCompany;
|
||||
|
||||
In case the subcontracted product you receive from your subcontractor
|
||||
contains tracked components, you will need to specify the *serial/lot
|
||||
numbers* of the components in question for traceability. This operation
|
||||
is included in the receipt of the subcontracted product.
|
||||
- **B**: Cost of raw materials sourced directly from the
|
||||
subcontractor;
|
||||
|
||||
On the receipt, you see a *Record Components* button appearing when
|
||||
necessary. If you click on it, a *Produce* wizard opens in which you
|
||||
will have to enter the *serial/lot numbers* of the components, and the
|
||||
finished product if it is also tracked, like in the below example.
|
||||
- **s**: Cost of the subcontracted service.
|
||||
|
||||
Sending raw materials to your subcontractors (**A**) does not impact
|
||||
the inventory valuation, the components still belonging to your company.
|
||||
To manage this, the *Subcontracting Location* is configured as an
|
||||
*Internal Location* so that the components are still valued in the
|
||||
inventory.
|
||||
|
||||
Then, the vendor price set on the product C form has to be what has to
|
||||
be paid to the subcontractor for his parts and service time: **B +
|
||||
s**. The product cost has to be: **A + B + s**, how much the
|
||||
product is valued in the accounting.
|
||||
|
||||
Finally, the subcontractor bill matches the purchase order, with the
|
||||
proposed price coming from the finished products C.
|
||||
|
||||
.. note::
|
||||
If managing the replenishment of raw materials **B** at your
|
||||
subcontractor’s location is not needed, simply include the cost of
|
||||
**B** in the subcontractor’s price **s** and remove the products
|
||||
*B* from the *BoM*.
|
||||
|
||||
Traceability
|
||||
============
|
||||
|
||||
In case the products received from the subcontractor contain tracked
|
||||
components, their serial or lot numbers need to be specified during the
|
||||
receipt.
|
||||
|
||||
On the receipt of the subcontracted product, a *Record Components*
|
||||
button appears when necessary. Click on it to open a dialog and record
|
||||
the serial/lot numbers of the components. If the finished product is
|
||||
also tracked, its serial/lot number can be registered here too.
|
||||
|
||||
.. image:: media/subcontracting_05.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
For audit purposes, it is possible to check the lot numbers recorded on
|
||||
a receipt by using the icon on the right of the finished products:
|
||||
|
||||
.. image:: media/subcontracting_06.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
Once this information has been entered, you will see a new icon on the
|
||||
receipt stock move, which will allow you to find back the components
|
||||
which are part of the finished product.
|
||||
Automate Replenishment of Subcontractors
|
||||
========================================
|
||||
|
||||
To manage the resupply of your subcontractor, activate
|
||||
*Multi-locations* in :menuselection:`Inventory --> Configuration -->
|
||||
Configuration`. Then, the inventory at the subcontractor location can
|
||||
be tracked.
|
||||
|
||||
It is possible to resupply subcontractors by sending products from the
|
||||
company locations, or by sending products from another supplier to the
|
||||
subcontractors.
|
||||
|
||||
Replenishment from the warehouse
|
||||
--------------------------------
|
||||
|
||||
Resupplying subcontractors manually is the simplest approach. To do so,
|
||||
create delivery orders in which the subcontractor is set as a delivery
|
||||
address and fill the components to deliver.
|
||||
|
||||
To automate the subcontractors’ replenishment propositions, there are
|
||||
two approaches:
|
||||
|
||||
- Reordering rules;
|
||||
- Replenish on order flow.
|
||||
|
||||
For the first one, just define a reordering rule on the subcontracting
|
||||
location, with a minimum and maximum inventory level. When the
|
||||
reordering rule is triggered, a delivery order is created to ship the
|
||||
components to the subcontractor.
|
||||
|
||||
.. image:: media/subcontracting_07.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
Resupply the subcontractor with the components
|
||||
==============================================
|
||||
|
||||
There are 3 ways to manage the resupply of your subcontractor with the
|
||||
components:
|
||||
|
||||
- **Manually**: You create a delivery order in which you set the subcontractor as a partner and you choose the components to deliver.
|
||||
The second approach is to use a “pull” flow. Here, the demand in the
|
||||
finished product (real demand or forecasted one through the Master
|
||||
Production Schedule) triggers the replenishment of the subcontractor. To
|
||||
do so, select the route *Resupply Subcontractor on Order* on the
|
||||
wanted components.
|
||||
|
||||
.. image:: media/subcontracting_08.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
.. note::
|
||||
You therefore need to activate *Multi-locations* in the inventory settings.
|
||||
Replenishment from another supplier
|
||||
-----------------------------------
|
||||
|
||||
When purchasing items to another supplier, it is possible to ask him to
|
||||
deliver the subcontractor directly. To do so, activate the *Drop
|
||||
Shipping* feature in :menuselection:`Purchase --> Configuration -->
|
||||
Configuration`.
|
||||
|
||||
Now, set the *Dropship* option in the *Deliver To* field of the
|
||||
*Other Information* tab. Then, provide the address of the
|
||||
subcontractor for the shipping.
|
||||
|
||||
.. image:: media/subcontracting_09.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
- **With reordering rules**: You can define a *reordering rule* on the *Subcontracting location* to ensure that they are always enough components sent to your subcontractors. When the reordering rule is triggered, a delivery order is created for the product is automatically created.
|
||||
That way, the supplier can ship items directly and you simply receive
|
||||
and pay the bill. However, it is still required to validate receipts for
|
||||
the subcontractor.
|
||||
|
||||
.. image:: media/subcontracting_10.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
- **On order**: You can also deliver the components to your subcontractors each time you order a subcontracted product. For this, you need to tick the route *Resupply Subcontractor on Order* on the wanted components.
|
||||
Quality Control
|
||||
---------------
|
||||
|
||||
Controlling the quality of the products manufactured by subcontractors
|
||||
is possible thanks to the Odoo Quality app. Quality checks can be made
|
||||
on a manufacturing step but, because the manufacturing process is
|
||||
handled by an external party, it can be defined on the product
|
||||
reception.
|
||||
|
||||
.. image:: media/subcontracting_11.png
|
||||
:align: center
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
To create a quality check at the receipt, open the *Quality* app and
|
||||
create a new *Control Point* on the reception.
|
||||
|
||||
.. image:: media/subcontracting_12.png
|
||||
:align: center
|
||||
:alt:
|
||||
|
||||
By doing so, a quality check is automatically created each time a
|
||||
finished product is received.
|