Manufacturing order costs
|
||||
=========================
|
||||
|
||||
.. |MO| replace:: :abbr:`MO (Manufacturing Order)`
|
||||
.. |MOs| replace:: :abbr:`MOs (Manufacturing Orders)`
|
||||
.. |POs| replace:: :abbr:`POs (Purchase Orders)`
|
||||
.. |BoM| replace:: :abbr:`BoM (Bill of Materials)`
|
||||
.. |BoMs| replace:: :abbr:`BoMs (Bills of Materials)`
|
||||
|
||||
The ability to accurately calculate the cost of manufacturing a product is critical when determining
|
||||
product profitability. Odoo's *Manufacturing* app simplifies this calculation by automatically
|
||||
calculating the cost to complete each manufacturing order (MO), as well as the average production
|
||||
cost of a product, based on all completed |MOs|.
|
||||
|
||||
.. important::
|
||||
Odoo's Manufacturing app distinguishes between the *manufacturing order cost* and the *real cost*
|
||||
of an |MO|.
|
||||
|
||||
The |MO| cost represents how much it *should* cost to complete an |MO|, based on the
|
||||
configuration of the product's bill of materials (BoM). This takes into account the cost and
|
||||
quantity of components, as well as the cost of completing the necessary operations.
|
||||
|
||||
The real cost represents how much it *actually* costs to complete the |MO|. A few factors can
|
||||
cause the real cost to differ from the |MO| cost. For example, an operation may take longer to
|
||||
complete than estimated, a greater component quantity might be needed than was specified on the
|
||||
|BoM|, or the price of components may change during manufacturing.
|
||||
|
||||
Cost configuration
|
||||
==================
|
||||
|
||||
Odoo computes |MO| costs based on the configuration of the |BoM| used to manufacture a product. This
|
||||
includes the cost and quantity of components and operations listed on the |BoM|, in addition to the
|
||||
operating costs of the work centers where those operations are carried out.
|
||||
|
||||
Component cost
|
||||
--------------
|
||||
|
||||
Component cost is calculated automatically, based on the average purchase cost of a component across
|
||||
all purchase orders (POs). To view a component's cost, navigate to :guilabel:`Inventory app -->
|
||||
Products --> Products`, and select a component product. The cost is displayed in the
|
||||
:guilabel:`Cost` field of the :guilabel:`General Information` tab, on the component's product form.
|
||||
|
||||
It is possible to set the cost of a component manually, by clicking the :guilabel:`Cost` field on
|
||||
the component's product form, and entering a value. However, any future |POs| for the component
|
||||
override a value entered manually, resetting the :guilabel:`Cost` field back to an automatically
|
||||
computed value.
|
||||
|
||||
Work center cost
|
||||
----------------
|
||||
|
||||
To set the operating cost for a specific work center, navigate to :menuselection:`Manufacturing app
|
||||
--> Configuration --> Work Centers`, and select a work center.
|
||||
|
||||
To set the operating cost for the work center, as a whole, enter a value in the :guilabel:`per
|
||||
workcenter` field, located beside the :guilabel:`Cost per hour` section on the work center's
|
||||
:guilabel:`General Information` tab. This operating cost is used regardless of how many employees
|
||||
are working at the work center at any given time.
|
||||
|
||||
To set the operating cost for the work center based on the number of employees working there at a
|
||||
given time, enter a value in the :guilabel:`per employee` field, located beside the :guilabel:`Cost
|
||||
per hour` section on the work center's :guilabel:`General Information` tab. For example, if `25.00`
|
||||
is entered in the :guilabel:`per employee` field, it costs $25.00 per hour for *each* employee
|
||||
working at the work center.
|
||||
|
||||
Note that, if values are entered in both the :guilabel:`per workcenter` *and* :guilabel:`per
|
||||
employee` fields, the value in the :guilabel:`per workcenter` field takes precedence, and the value
|
||||
in the :guilabel:`per employee` field is ignored.
|
||||
|
||||
.. important::
|
||||
It is also possible to set a per hour cost for specific employees, by navigating to the
|
||||
:menuselection:`Employees` app, selecting an employee, clicking the :guilabel:`HR Settings` tab
|
||||
on their employee form, and entering a value in the :guilabel:`Hourly Cost` field.
|
||||
|
||||
Just like the *per workcenter* field on a work center form, the :guilabel:`Hourly Cost` field on
|
||||
an employee's form overrides the *per employee* field on a work center form.
|
||||
|
||||
However, the *per workcenter* field takes precedence over both the *per employee* field on the
|
||||
workcenter form *and* the :guilabel:`Hourly Cost` field on the employee form.
|
||||
|
||||
|BoM| cost
|
||||
----------
|
||||
|
||||
Configuring a |BoM| so Odoo can accurately calculate the cost of |MOs| that use it requires two
|
||||
steps. First, components **must** be added, and the required quantity specified. Second, operations
|
||||
**must** be added, along with the work centers where they are carried out.
|
||||
|
||||
Begin by navigating to :menuselection:`Manufacturing app --> Products --> Bills of Materials`.
|
||||
Select a |BoM|, or create a new one by clicking :guilabel:`New`.
|
||||
|
||||
In the :guilabel:`Components` tab of the |BoM| form, add each component by clicking :guilabel:`Add a
|
||||
line`, selecting the component from the drop-down menu in the :guilabel:`Component` column, and
|
||||
entering the quantity in the :guilabel:`Quantity` column.
|
||||
|
||||
In the :guilabel:`Operations` tab, add an operation by clicking :guilabel:`Add a line` to open the
|
||||
:guilabel:`Create Operations` pop-up window. Enter a title for the operation in the
|
||||
:guilabel:`Operation` field.
|
||||
|
||||
Select the :guilabel:`Work Center` where the operation is carried out. Then, add a
|
||||
:guilabel:`Default Duration`, which is the estimated amount of time the operation takes to complete.
|
||||
|
||||
By default, the :guilabel:`Duration Computation` field is set to :guilabel:`Set duration manually`,
|
||||
which means that the number entered in :guilabel:`Default Duration` field is always used as the
|
||||
expected duration of the operation.
|
||||
|
||||
Selecting :guilabel:`Compute based on tracked time` causes Odoo to automatically compute the default
|
||||
duration based on a certain number of work orders, which is set in the :guilabel:`Based on` field.
|
||||
Before there are work orders to compute this duration, the value in the :guilabel:`Default Duration`
|
||||
field is used instead.
|
||||
|
||||
The hourly cost of operating the work center, and the duration of the operation, are used to
|
||||
calculate the operation's cost.
|
||||
|
||||
Finally, click :guilabel:`Save & Close` to add the operation to the |BoM|, and close the
|
||||
:guilabel:`Create Operations` pop-up window. Alternatively, click :guilabel:`Save & New` to add the
|
||||
operation to the |BoM|, and open a blank :guilabel:`Create Operations` pop-up window to add another
|
||||
operation.
|
||||
|
||||
.. seealso::
|
||||
For a full overview of |BoM| configuration, see the documentation on :doc:`bills of materials
|
||||
<bill_configuration>`.
|
||||
|
||||
|MO| overview
|
||||
=============
|
||||
|
||||
Each |MO| has an *overview* page, which lists a variety of information about the |MO|, including
|
||||
|MO| cost and real cost. To view the overview for an |MO|, navigate to :menuselection:`Manufacturing
|
||||
app --> Operations --> Manufacturing Orders`, and select an |MO|. Then, click the :icon:`fa-bars`
|
||||
:guilabel:`Overview` smart button at the top of the |MO|.
|
||||
|
||||
Both the |MO| cost and real cost take into account the cost and quantity of components, as well as
|
||||
the cost of completing each work order. The overview page lists a row for each of these values, with
|
||||
the sum of them listed at the bottom of the :guilabel:`MO Cost` and :guilabel:`Real Cost` columns.
|
||||
|
||||
Before work begins on an |MO|, the :guilabel:`MO Cost` and :guilabel:`Real Cost` columns display the
|
||||
same costs. This is the *estimated* cost of completing the |MO|.
|
||||
|
||||
However, once work commences, the values in the :guilabel:`Real Cost` column may begin to diverge
|
||||
from the values in the :guilabel:`MO Cost` column. This happens if a different component quantity is
|
||||
used than was listed on the |MO|, or if the duration of a work order is different than expected.
|
||||
|
||||
Once the |MO| has been completed by clicking :guilabel:`Produce All`, the values in the
|
||||
:guilabel:`MO Cost` column update to match those displayed in the :guilabel:`Real Cost` column.
|
||||
|
||||
.. image:: mo_costs/overview.png
|
||||
:align: center
|
||||
:alt: The MO Overview page.
|
||||
|
||||
Average manufacturing cost
|
||||
==========================
|
||||
|
||||
In addition to the cost of each individual |MO| for a product, Odoo also tracks the average cost of
|
||||
manufacturing the product, taking into account the cost of every completed |MO|. To view this,
|
||||
navigate to :menuselection:`Inventory app --> Products --> Products`, and select a product.
|
||||
|
||||
The manufacturing cost of the product is displayed per unit of measure in the :guilabel:`Cost`
|
||||
field, located in the :guilabel:`General Information` tab. The value continues to update as the
|
||||
costs of additional |MOs| are factored into the average cost.
|
||||
|
||||
To the right of the :guilabel:`Cost` field is a :guilabel:`Compute Price from BoM` button, which
|
||||
only appears for products with at least one |BoM|. Click this button to reset the cost of the
|
||||
product to the expected cost, which only takes into account the components and operations listed on
|
||||
the |BoM|.
|
||||
|
||||
.. important::
|
||||
|
||||
Be aware that clicking :guilabel:`Compute Price from BoM` does not set the price permanently. The
|
||||
cost continues to update based on the average of the |BoM| price and the real cost of any future
|
||||
|MOs|.
|
||||
|
||||
.. admonition:: Example workflow: manufacturing cost
|
||||
:class: alert alert-success
|
||||
|
||||
Golf product manufacturer *Fairway Fields* produces a variety of golf products, including an
|
||||
indoor *putting green*. They have configured a |BoM| for the putting green, so Odoo automatically
|
||||
calculates the manufacturing cost of each putting green |MO|.
|
||||
|
||||
The |BoM| lists two components:
|
||||
|
||||
- One unit of *green felt*, which costs $20.00.
|
||||
- One unit of a *rubber pad*, which costs $30.00.
|
||||
|
||||
The |BoM| also lists four operations, all of which are carried out at *Assembly Station 1*, which
|
||||
has an hourly operating cost of $30.00. Those operations are as follows:
|
||||
|
||||
- *Cut felt*: default duration of seven minutes, for a total cost of $3.50.
|
||||
- *Cut rubber pad*: default duration of five minutes, for a total cost of $2.50.
|
||||
- *Attach pad to felt*: default duration of 15 minutes, for a total cost of $7.50.
|
||||
- *Cut holes*: default duration of three minutes, for a total cost of $1.50.
|
||||
|
||||
Altogether, the components required to produce one putting green cost $50.00, and the operations
|
||||
required cost $15.00, for a total manufacturing cost of $65.00. This cost is reflected in the
|
||||
:guilabel:`Cost` field on the putting green's product form.
|
||||
|
||||
Fairway Fields confirms an |MO| for one putting green. Before manufacturing starts, the |MO|
|
||||
overview lists a cost of `$65.00` in both the :guilabel:`MO Cost` and :guilabel:`Real Cost`
|
||||
fields.
|
||||
|
||||
.. image:: mo_costs/overview-before.png
|
||||
:align: center
|
||||
:alt: The MO Overview page for one putting green, before production starts.
|
||||
|
||||
Manufacturing begins, and the operations take ten minutes longer than expected, for a total
|
||||
manufacturing time of 40 minutes. This deviation from the |BoM| is reflected on the |MO|
|
||||
overview, which now lists a :guilabel:`Real Cost` of `$70.00`.
|
||||
|
||||
.. image:: mo_costs/overview-during.png
|
||||
:align: center
|
||||
:alt: The MO Overview page for one putting green, during production.
|
||||
|
||||
Once manufacturing is finished, and the |MO| is marked as *Done*, the |MO| overview updates
|
||||
again, so the values in the :guilabel:`MO Cost` and :guilabel:`Real Cost` columns match, each
|
||||
displaying a value of `$70.00`.
|
||||
|
||||
On the putting green's product page, the :guilabel:`Cost` field now displays a cost of `$67.50`,
|
||||
the average of the original cost of $65.00 and the real cost of $70.00 from the |MO|.
|
Binary file not shown.
After Width: | Height: | Size: 15 KiB |
Binary file not shown.
After Width: | Height: | Size: 16 KiB |
Binary file not shown.
After Width: | Height: | Size: 20 KiB |
Loading…
Reference in New Issue
Block a user