Since odoo/documentation#903, the guideline for the location of new resource (images, downloadable files, RST includes...) files is to place those inside the directory of the RST page that references them. For example, if `doc1.rst` has a reference to `image.png` and to `download.zip`, the file structure should look like this: ├── parent_doc/ │ └── doc1/ │ │ └── image.png │ │ └── download.zip │ └── doc1.rst │ └── doc2.rst ├── parent_doc.rst Before this commit, most of the resource files were still located inside 'media' directories holding all the resource files referenced by RST pages located at the same level as these directories. In the example above, a single 'media' directory would hold all the resource files referenced by both `doc1.rst` and `doc2.rst`. Doing so prevented us from figuring out easily which resource file was referenced by which RST page and, thus, lead to unused resource files piling up in the repository. It also made it more complicated to define codeowners regex rules because a team could not simply be assigned to `/some_page.*` but needed to be assigned to both `/some_page\.rst` and to the location of 'media'. In order to help new content writers figure out the guideline when taking examples from other RST pages, this commit retroactively applies the guideline to existing resource files and 'media' directories. The left-over resource files that are not referenced by any RST page are removed. task-2497965 Part-of: odoo/documentation#2066
214 lines
7.5 KiB
ReStructuredText
214 lines
7.5 KiB
ReStructuredText
==============================
|
||
Subcontract your Manufacturing
|
||
==============================
|
||
|
||
Outsourcing a portion or all of your company’s manufacturing needs
|
||
is not easy. To make it work correctly, you have to:
|
||
|
||
- Manage the inventory of raw materials at your subcontractor
|
||
- Ship raw material to your subcontractors, at the right time
|
||
- Control incoming goods quality
|
||
- Control subcontractors bills
|
||
|
||
Here is an example of subcontracting the manufacturing of “C”, which is
|
||
produced out of raw materials “A” and “B”.
|
||
|
||
.. image:: subcontracting/subcontracting_01.png
|
||
:align: center
|
||
:alt:
|
||
|
||
With its MRP subcontracting feature, Odoo helps you handle this flow easily.
|
||
|
||
Configuration
|
||
=============
|
||
|
||
To use the subcontracting feature, go to :menuselection:`Manufacturing
|
||
--> Configuration --> Settings` and tick the box *Subcontracting*.
|
||
|
||
.. image:: subcontracting/sbc_1.png
|
||
:align: center
|
||
:alt:
|
||
|
||
To define if a product must be subcontracted, use a *Bill of Materials
|
||
(BoM)* of type *Subcontracting*.
|
||
|
||
To create a new *BoM*, go to :menuselection:`Manufacturing --> Products -->
|
||
Bill of Materials` and hit create. Then, list the components
|
||
your subcontractor needs to manufacture the product. For costing
|
||
purposes, you might want to register all the components, even the ones
|
||
that are sourced directly from the subcontractor.
|
||
|
||
Once you have set the *BoM Type* to *Subcontracting*, specify one or
|
||
several subcontractors.
|
||
|
||
.. image:: subcontracting/sbc_2.png
|
||
:align: center
|
||
:alt:
|
||
|
||
Basic Subcontracting Flow
|
||
=========================
|
||
|
||
To let your subcontractor know how many products you need, create and
|
||
send them purchase orders (PO). To do so, go to the *Purchase* app and
|
||
create a new purchase order. Be sure to send the PO to a vendor that is
|
||
defined as a subcontractor on the *BoM* of these products.
|
||
|
||
.. image:: subcontracting/subcontracting_04.png
|
||
:align: center
|
||
:alt:
|
||
|
||
Once the *PO* is validated (1), a pending receipt is created. When the
|
||
products are received, validate the receipt (2), with the actual
|
||
quantity received. As a result, Odoo does the following things for you:
|
||
|
||
- Consumes the respective components at the subcontractor’s location, based on the *BoM* and your input (3);
|
||
|
||
- Produces the finished goods at the subcontractor’s location (4);
|
||
|
||
- Moves products from that subcontractor’s location to YourCompany
|
||
via the validated receipt (5).
|
||
|
||
|
||
.. note::
|
||
The *PO* is optional. If you create a receipt manually, with the right
|
||
subcontractor, Odoo still performs all the moves. This can be useful if
|
||
the subcontractor does not bill a fixed price per item, but rather the time
|
||
and materials used.
|
||
|
||
Inventory Valuation
|
||
===================
|
||
|
||
The cost of the manufactured product “C” is defined as:
|
||
|
||
**C = A + B + s**
|
||
|
||
With:
|
||
|
||
- **A**: Cost of raw materials coming from YourCompany;
|
||
|
||
- **B**: Cost of raw materials sourced directly from the
|
||
subcontractor;
|
||
|
||
- **s**: Cost of the subcontracted service.
|
||
|
||
Sending raw materials to your subcontractors (**A**) does not impact
|
||
the inventory valuation, as the components are still valued as part of
|
||
your stock. This is managed by making the *Subcontracting Location* an
|
||
*Internal Location*.
|
||
|
||
Then, the vendor price set on the product C form has to be what has to
|
||
be paid to the subcontractor for his parts and service time: **B +
|
||
s**. The product cost has to be: **A + B + s**, how much the
|
||
product is valued in the accounting.
|
||
|
||
Finally, the subcontractor bill then matches the purchase order, with
|
||
the proposed price coming from the finished products C.
|
||
|
||
.. note::
|
||
If managing the replenishment of raw materials **B** at your
|
||
subcontractor’s location is not needed, simply include the cost of
|
||
**B** in the subcontractor’s price **s** and remove the products
|
||
*B* from the *BoM*.
|
||
|
||
Traceability
|
||
============
|
||
|
||
In case the received products from the subcontractor contain tracked
|
||
components, their serial or lot numbers need to be specified during the
|
||
receipt.
|
||
|
||
In that case, on the receipt of the subcontracted product, a *Record Components*
|
||
button appears. Click on it to open a dialog box and record the serial/lot numbers of
|
||
the components. If the finished product is also tracked, its serial/lot number can
|
||
be registered here too.
|
||
|
||
.. image:: subcontracting/sbc_3.png
|
||
:align: center
|
||
:alt:
|
||
|
||
For audit purposes, it is possible to check the lot numbers recorded on
|
||
a receipt by using the icon on the right of the finished products:
|
||
|
||
.. image:: subcontracting/sbc_4.png
|
||
:align: center
|
||
:alt:
|
||
|
||
Also note that in case flexible consumption has been selected on the subcontracted
|
||
BOM for a non-tracked product, the record components option will also appear
|
||
optionally on each move line, if you want to register more or less component consumption
|
||
at your subcontracting location, when receiving your final product.
|
||
|
||
.. image:: subcontracting/sbc_5.png
|
||
:align: center
|
||
:alt:
|
||
|
||
As you can see, the reception of both of these non-tracked products can either be executed
|
||
by selecting the 'Set Quantities' Option or via the move line hamburger menus.
|
||
|
||
Automate Replenishment of Subcontractors
|
||
========================================
|
||
|
||
There are two ways to automate the supply of raw materials to your
|
||
subcontractors when purchasing the final product. The chosen method
|
||
depends on whether or not you want the materials to transit through your
|
||
warehouse. Both of these methods are described as pull style mechanisms as
|
||
their trigger is the inital PO to the subcontractor, which creates a need
|
||
at the subcontracting location, for raw material.
|
||
|
||
If you are supplying your subcontractor with raw material from your own warehouse,
|
||
you must activate the 'Resupply Subcontractor on Order' route as shown
|
||
below. If this is a component that you buy from a vendor, the buy route
|
||
should also be activated.
|
||
|
||
|
||
.. image:: subcontracting/sbc_6.png
|
||
:align: center
|
||
:alt:
|
||
|
||
|
||
Now, if you want your vendor to resupply your subcontractor directly, you
|
||
must choose the 'Dropship Subcontractor on Order' option instead. In order
|
||
for this option to be active on the product form, you must first activate the
|
||
dropship option from :menuselection:`Purchase --> Configuration --> Settings -->
|
||
Dropshipping`.
|
||
Once the PO to the subcontractor is validated, this route will create a dropship
|
||
RFQ from your vendor to that subcontractor. You then just need to review and validate it.
|
||
|
||
|
||
.. image:: subcontracting/sbc_7.png
|
||
:align: center
|
||
:alt:
|
||
|
||
Note that the buy route is not selected in this case, as the dropship route is
|
||
a buy route already.
|
||
|
||
Finally, if you want to track the stock of these raw materials at your subcontracting
|
||
location(s), then you must activate *Multi-locations* in :menuselection:`Inventory -->
|
||
Configuration --> Settings --> Storage locations`.
|
||
|
||
From the location form, you are then able to access the Current Stock.
|
||
|
||
.. image:: subcontracting/sbc_8.png
|
||
:align: center
|
||
:alt:
|
||
|
||
|
||
|
||
Manual Replenishment
|
||
--------------------------------
|
||
|
||
You can also choose to replenish your subcontractors manually.
|
||
|
||
If you want to send components to your subcontractor at your own convenience,
|
||
select the 'Resupply Subcontractor' Operation Type from the *Inventory* Module,
|
||
and create a picking, specifying to which subcontractor you are delivering to.
|
||
|
||
.. image:: subcontracting/sbc_9.png
|
||
:align: center
|
||
:alt:
|
||
|
||
Alternatively, you can also manually ask your vendor to resupply your subcontractor
|
||
by creating a dropship type PO, with your subcontractor set as the delivery address.
|
||
|
||
.. image:: subcontracting/sbc_10.png
|
||
:align: center |