232aa271b0 [ADD] runbot_merge: PR dashboard V2
Displays the entire batch set as a table, along both
repository (linked PRs) and branch (forward ports). Should provide a
much more complete overview.

Adds a copy of the dashboard as a raster render, to link from the PR:
as usual SVG is shit, content-based viewboxes are hell and having to
duplicate the entire CSS because `<img/>`-linked CSS can't run is
gross. And there's no payoff since the image is not interactible
anyway.

Performing manual ad-hoc table rendering via pillow is not
significantly worse, it works fine and it's possible to do *really*
good conditional request handling (hopefully) because I've basically
got all the information I need right here.

In fact it might make sense to upgrade the regular HTML page with
similar conditional request handling, at least for the last-update
bit if not the etag.

Fixes #771,fixes #770
2024-05-29 07:55:07 +02:00
Xavier Morel
473f89f87d [CHG] *: persistent batches
This probably has latent bugs, and is only the start of the road to v2
(#789): PR batches are now created up-front (alongside the PR), with
PRs attached and detached as needed, hopefully such that things are
not broken (tests pass but...), this required a fair number of
ajustments to code not taking batches into account, or creating
batches on the fly.

`PullRequests.blocked` has also been updated to rely on the batch to
get its batch-mates, such that it can now be a stored field with the
right dependencies.

The next step is to better leverage this change:

- move cross-PR state up to the batch (e.g. skipchecks, priority, ...)
- add fw info to the batch, perform forward-ports batchwise in order
  to avoid redundant batch-selection work, and allow altering batches
  during fw (e.g. adding or removing PRs)
- use batches to select stagings
- maybe expose staging history of a batch?
2024-05-23 07:58:58 +02:00
Xavier Morel
780e20bfd6 [IMP] runbot_merge: filtering options and UX on stagings list
Allow filtering stagings by state (success or failure), and provide a
control to explicitly update the staging date limit.

Should make it easier to drill through stagings when looking for
specific information.

Related to #751
2023-07-10 15:23:31 +02:00
Xavier Morel
5bce73c97d [IMP] *: optimise loading of home page
Fix outstanding query to make a positive `state` filtering, instead of
negative, matching 3b52b1aace8674259812a76b1566260937dbcacb.

Also manually create a map of stagings (grouped by branch) sharing a
single prefetch set.

For odoo the mergebot home page has 12 branches in the odoo project
and 8 in spreadsheet, 6 stagings each. This means 120 queries to
retrieve all the heads (Odoo stagings have 5 heads and spreadsheet
have 1, but that seems immaterial).

By fixing `_compute_statuses` and creating a single prefetch set for
all stagings of all branches we can fetch all the commits in a single
query instead of 120.
2023-07-10 15:23:31 +02:00
Xavier-Do
2ad188201b [IMP] runbot_merge: speedup frontend page
The mergebot page become a bit slow with the years, it is time to make
small optimisation to speed up thinks a little.

Note: all changes where applied modifying the views or adding index by
hand. There is still room for improvement but it would need more in
depth refactoring, mainly adding specialized computed fields to
enable a better batching.

The first issue was using branch.staging_ids

    branch.staging_ids.sorted(lambda s: s.staged_at, reverse=True)[:6]

The number of staging_ids is increasing and prefetching + sorting all
of them is slow.

The proposed solution is to replace it by a search, not ideal, a
specialized compute field may be a good idea, but this is a quick fix
that can be done editing a view.

    branch.env['runbot_merge.stagings'].search([('target', '=', branch.id)],order='staged_at desc', limit=6)

Other changes are just index on critical columns.

Before changes, /runbot_merge page takes ~5s to load
After changes,  /runbot_merge page takes ~1s to load

Small note: note 100% sure that runbot_merge.batch.target was useful
2023-04-05 09:05:50 +02:00
Xavier Morel
fb8f44dd01 [FIX] runbot_merge: 15.0 compatibility (t-raw deprecation)
MERGEBOT-H9
2022-12-01 10:57:32 +01:00
Xavier Morel
3e2db48786 [FIX] runbot_merge: more frontend templates
af016f4239 did a half-assed job and
didn't fix the one test which actually checks the dashboard.

TBF I was in a bit of a hurry trying to make the mergebot work and be
presentable again, but still...
2022-11-30 12:45:11 +01:00
Xavier Morel
af016f4239 [FIX] runbot_merge: frontend templates & styles for 15.0
15.0 (or 14.0) dropped some of the BS3 (?) compatibility stuff, which
the mergebot was (apparently) relying on. This lead to a visual
degradation as well as the frontend dropdown looking absolutely awful.

Fix that, on both style and templates.

15.0 (or 14.0) also dropped the bespoke responsive utility classes,
switch to bootstrap's.
2022-11-29 10:41:50 +01:00
Xavier Morel
57162547e0 [FIX] runbot_merge: Odoo 15.0 + Py3.10 compat
Turns out I was running "15.0" except just on the runbot, enterprise
and community were still the 14.0 repos, so some of the changes were
missing.

While at it, bundle fixes for 3.10, as that's what Jammy needs, and
the mergebot/15.0 will be running on that.
2022-11-17 10:30:04 +01:00
Xavier Morel
389ea03544 [MERGE] from 14.0
Get mergebot updates from since the runbot was upgraded.

Also convert assets to new system for compatibility.
2022-08-24 08:40:18 +02:00
Xavier Morel
c85735870a [FIX] runbot_merge: bugs in log of branch stagings (in frontend)
- Some batches in a few stagings are apparently empty (e.g. batch
  71771 from staging 32511), the listing was not resilient to such
  issues.

  Update the code to suppress the display of empty batches.
- The possibility of accessing `/runbot_merge/<id>` with a
  non-existent branch had not been considered and triggered a
  rendering error in the template.

Fixes #630, fixes #631
2022-08-05 15:35:51 +02:00
Xavier Morel
0c882fc0df [IMP] runbot_merge: automation around branch deactivation
Currently deactivating a branch kinda leaves users in the dark, with
little way to know what has happened aside from inferring it from the
branch having disappeared from the main dashboard.

- surface the state of the branch in the PR dashboard (also surface
  the target branch at all so users can see if their PR is targeted
  as they expect as far as the mergebot is concerned)
- close & notify every PR to a branch being deactivated
- cancel any current staging to the branch (as a consequence of the
  above)

Closes #632
2022-08-05 15:35:51 +02:00
Xavier Morel
21899af758 [FIX] runbot_merge: brainfart in dashboard warning 2022-08-05 15:35:51 +02:00
Xavier Morel
64eeb6142e [FIX] runbot_merge: also show banners on PR pages
It's likely that the PR pages are seen more commonly than the
dashboard by most users, so add alerts there in case users wonder
what's happening.

Fixes #580
2022-08-05 15:35:51 +02:00
Xavier Morel
0016404474 [IMP] runbot_merge: better styling for missing statuses on stagings
Before this, until the first status for a required context the status
would appear as pending, but would be have oddly (e.g. not clickable).

Update the style of such statuses for clarity:

- use a light background to show them as inactive
- use the `wait` cursor to show their status as oddball (and not clickable)

Setting this styling on the link (or even `li`) doesn't seem to work,
so set it on the `ul`, the actual active links will set the relevant
"active" cursor instead, which seems to work fine.

While at it, extract the status menu to its own template and unify the
disparate bits, mainly in that both the main dashboard and the
per-branch list display the staging instant in UTC on hover: before,
the main dashboard would display a relative delta and provide the
UTC-formatted instant on hover, but the branch would only show a zoned
ISO-8601 instant.

While adjusting is easy, it's unnecessary, we can easily provide the UTC
staging instant there).
2022-06-30 15:07:49 +02:00
Xavier Morel
a5fae548fe [IMP] runbot_merge: extract dashboard pr linking
Extract the creation of a PR link (to github) as a dedicated
template for easier updates, and to use `display_name`
everywhere (instead of reimplementing it by name).

Also implement support for repo-level groups setting for information
hiding.

Fixes #590
2022-06-30 15:07:49 +02:00
Xavier Morel
66c2bdc25b [IMP] runbot_merge: error reporting on fast-forward failure
When a staging's fast-forward (to the target branch) fails, the
mergebot would provide no useful information on the staging or the
dashboard.

This is because the reason was set to the HTTP status, which in case
of a fast-forward error is just "422 client error: unprocessable
entity".

Improve this by trying to parse github's response in that case, and
using the JSON error message as failure reason. This provides more
useful failure information like "update is not a fast forward",
"reference does not exist", or a branch protection failure.

Closes #591
2022-06-30 15:07:49 +02:00
Xavier Morel
2204c0410a [IMP] mergebot, forwardbot: various UI bits
- code in the various menus added over time through the UI (queues,
  configuration, ...)
- update / improve PR layout a tick
- fix "outstanding forward ports" count on the dashboard
- improve hover title / help on dashboard
  - add date of last modification (usually date of success / failure)
  - make casing more coherent (everything lowercase)
  - add explicit note that UTC date on staged at label is staged at datetime
  - rediscover yet again that the staging information is when hovering
    on the staging *except the staged at label*
- improve `PullRequest.unstage` to always insert the PR at the start of the
  reason when cancelling the staging, for clarity / traceability

Closes #560, closes #609
2022-06-30 15:07:49 +02:00
Xavier-Do
3071f5a6db [IMP] runbot: adapt for odoo 15.0 2022-06-02 10:50:42 +02:00
Xavier Morel
0e087e7433 [ADD] mergebot, forwardbot: changelog
* Adds a changelog page, linked from the main, with content
  automatically loaded from the source. To avoid conflicts, each entry
  is its own file and entries are grouped by the month during which
  the update will (probably) be deployed
* The last group (most likely "last update") doesn't have a title, the
  rest do.
* Add changelog entries from the last update so it's not too empty.
* Also update the layout for the alerts a bit: remove bottom margin to
  reduce loss of whitespace.
2021-10-20 15:16:48 +02:00
Xavier Morel
6c60d59b11 [IMP] forwardport: hall of fame layout and informations
The list of outstanding forwardports was pretty messy as the ordering
was unclear and there was little way to really drill into the thing.

* Shows outstanding forward ports sorted by merged date ascending, the
  oldest-merged PRs are the ones most in need of fixing while PRs
  which were only just merged can safely be ignored.
* List reviewers with outstanding forward-ports, allow filtering by
  clicking on their name, allow deseleting through the subtitle of the
  page.
* Don't display reviewer in list when page is already filtered by
  reviewer.

Also improve PR page a bit:

* Add reviewer.
* Add direct link to backend (closes #524).

Closes #529
2021-10-20 15:16:35 +02:00
xmo-odoo
874719870d
[FIX] runbot_message: error on PR page
The page of PRs in "error" is currently kinda broken: it does not show
any feedback aside from the PR being in error which is not very
useful.

The intent was always to show an explanation, but when adding the page
I just deref'd `staging_id` which always fails though in two different
ways:

* when the PR can not be staged at all (because of a conflict) there
  is no staging at all with a reason to show, so there should be
  a fallback that the PR could not even be staged
* `staging_id` is a related field which deref's to the staging_ids
  of the first *active* batch, except when a staging completes
  (successfully or not) both staging and batch are disabled.

  Plus the first batch will be the one for the first staging so if the
  PR is retried and fails again the wrong reason may be displayed.

  So update the section to show what we want: the reason of the
  staging of the *last* batch attached to the PR.

NOTE: there's one failure mode remaining, namely if a staging fails
      then on retry the PR conflicts with the new state of the
      repository (so it can't be staged at all), the "reason" will
      remain that of the staging. This could be mitigated by attaching
      a "nonsense" batch on failure to stage (similar to the
      forwardport stuff), that batch would have no staging, therefore
      no staging reason, therefore fallback.

Closes #525
2021-08-30 14:40:38 +02:00
Xavier Morel
6a8c13b1ef [IMP] runbot_merge: show linked PRs during staging and after merging
Previously, a PR's status page would only show the linked / related
PRs when `open`.

Since the relations between PRs remains useful, also make this
information available during staging and after merging.

Fixes #463
2021-08-24 15:39:47 +02:00
Xavier Morel
c1ebe9da52 [IMP] runbot_merge: format of staging timestamps
* in the main dashboard, show the exact UTC timestamp (with a Z
  marker) on hover, not just the relative delta
* in the branch details page, show the full timestamp, zoned, in
  ISO-8601 format
2021-08-24 15:39:47 +02:00
Xavier Morel
60af69b69f [FIX] runbot_merge: dashboard title should link to github
Currently links to self, which is not useful (the viewer is already
there).

Fixes #452
2021-03-02 14:28:32 +01:00
Martin Trigaux
8c625278c3 [FIX] runbot_merge: correct Linked PRs URLs
It was not evaluated and rendered to something like
  https://mergebot.odoo.com/odoo/odoo/pull/linked.url

Courtesy of Xavier Dollé (xdo)
2020-12-03 11:01:36 +01:00
Xavier Morel
5c19342bf6 [CHG] runbot_merge, forwardport: remove labelling
Because github materialises every labels change in the
timeline (interspersed with comments), the increasing labels churn
contributes to PRs being difficult to read and review.

This change removes the update of labels on PRs, instead the mergebot
will automatically send a comment to created PRs serving as a
notification that the PR was noticed & providing a link to the
mergebot's dashboard for that PR where users should be able to see the
PR state in detail in case they wonder what's what.

Lots of tests had to be edited to:

- remove any check on the labels of the PR
- add checks on the PR dashboard (to ensure that they're at least on
  the correct "view")
- add a helper to handle the comment now added to every PR by the 'bot
- since that helper is needed by both mergebot and forwardbot, the
  utils modules were unified and moved out of the odoo modules

Probably relevant note: no test was added for the dashboard
ACL, though since I had to explicitly unset the group on the repo used
for tests for things to work it looks to me like it at least excludes
people just fine.

Fixes #419
2020-11-20 07:41:54 +01:00
Xavier Morel
c80d8048f7 [ADD] runbot_merge: PR dashboard
Provides a view of the "ongoing" state of a PR in order to more easily
know what might be blocking / problematic.
2020-11-20 07:41:54 +01:00
Xavier Morel
b8408546a0 [FIX] runbot_merge: stagings dashboard
Mistake in the statuses handling: the context is not sufficient to
uniquely identify a staging status as different repositories can get
the same status context (e.g. ci/runbot is present on all our
repositories).

This is only a visual problem, but the status dropdown on
stagings (both the dashboard and the branchwise listing) would reuse
one of the status with the context for all of them, leading to
incorrect links and misleading displays.

Fix by keying on (repo, context) instead, that's exactly why the
repository name was part of the status in the first place.
2020-07-29 08:42:56 +02:00
Xavier Morel
7781d8b09c [IMP] runbot_merge: only show required statuses in the dashboard
Apparently a long-running issue but not really a concern before the
new mergebot started sending a lot more statuses: stagings would show
a list of all statuses they received, including optional / irrelevant
statuses.

Get a list of required statuses and only show that on the staging
dropdowns.

Closes #387
2020-07-27 12:56:41 +02:00
Xavier Morel
974bab40ba [IMP] runbot_merge: add style for successful but unmerged staging
Currently the PR becomes successful-green as soon as CI fully passes
but before it's merged, which can be an issue as e.g. merging might be
delayed (there's no visible difference between "CI success" and
"staging merged") or it might ultimately failed (FF error).

Create an intermediate color for "successful" stagings which are still
pending merge.

Also add a fallback message for fast-forward errors instead of en
empty string.

Closes #308
2020-03-16 15:03:11 +01:00
Xavier Morel
53e46001ba [IMP] runbot_merge, forwardport: notify when main crons are off
During freezes it can be useful to notify viewers that nothing is
going to forward port or merge for a while, and that this is
intentional (not something that's broken).

Fixes #307
2020-02-11 08:07:57 +01:00
Xavier Morel
c7393e2da9 [IMP] runbot_merge: explain why a PR is blocked on the dashboard
Refactor the selection thingie, hopefully in a way which doesn't
absolutely crater performances, so that it's possible to explain the
reason why a PR is considered blocked.
2020-01-31 15:19:32 +01:00
Xavier Morel
5dccb141b7 [FIX] runbot_merge: disable homepage added enabled by website
Pages take over from redirections which really is a pain in the ass
when trying to find out why the bloody redirection seemingly refuses
to work.

Note: can't use the record tag because homepage_page is marked as
noupdate, so we have to bypass the flag checking.
2020-01-23 13:57:33 +01:00
Xavier Morel
3f44bb5c9e [FIX] runbot_merge: styling crap
bs4 yields complete vomit on the template as-is (see:
https://imgur.com/a/XIMn7MX).

Add a bunch of color and styling overrides to get something closer to
the original, and move the existing styles to a "proper" scss file
while at it.
2020-01-21 11:21:14 +01:00
Xavier Morel
85035ad2c0 [IMP] runbot_merge: separate splits from other awaiting PRs
Should make the (eventual) wait and the extent of the splitting clearer.

Fixes #217
2019-10-07 09:26:27 +02:00
Xavier Morel
0152271fb8 [IMP] runbot_merge: layout responsivity
* only show 2 stagings on cellphones as 4 is way too much, moving to a
  vertical layout would probably be a bad idea as stagings can already
  be very tall and then we have multiple branches stacked on one
  another, unless we also make branches foldable

  the more complete list of stagings (per branch) is available on the
  branch's page anyway so providing a not-completely-broken home looks
  more useful, and at a fundamental level the current / last staging
  is really the one we care about
* remove the size bounds on stagings to avoid smushing all the cells
  together and overlapping text, sadly can't overflow scroll the
  stagings element because you can't have an overflow-x: scroll and an
  overflow-y: visible (that becomes auto)
2019-10-03 11:19:00 +02:00
Xavier Morel
0ae01c6ddb [FIX] runbot_merge: dropdown in branch staging history
Had apparently been fixed "live" but not committed in code, so every
update of the module would re-break it.

Fixes #221
2019-10-02 17:49:54 +02:00
Xavier Morel
0bfb018e49 [IMP] runbot_merge: table for staging history
That way all staging labels (timestamps) have the same width, and PRs
/ batches being wrapped don't look like weird-named stagings.
2019-08-26 11:56:42 +02:00
xmo-odoo
c4b7604999
[ADD] runbot_merge: staging history per branch
Closes #175
2019-08-21 14:15:10 +02:00
Christophe Simonis
5e611f54cb [IMP] runbot_merge: allow sorting & deactivating branches
Closes #144, closes #145
2019-06-28 11:31:06 +02:00
Christophe Simonis
483fc5319a [IMP] runbot_merge: show failed PR on dashboard
Closes #138
2019-06-11 11:31:24 +02:00
Xavier Morel
f5d783eb4b [FIX] runbot_merge: error in template
8d011e03d2 contains poopy bits in the
template, fix them.
2019-03-11 14:51:15 +01:00
Xavier Morel
8d011e03d2 [IMP] runbot_merge: styling of awaiting and blocked lists on dashboard 2019-03-06 09:46:57 +01:00
Xavier Morel
1f30af4345 [IMP] runbot_merge: dashboard clarity
* split out truly awaiting PRs from those waiting on an event of some
  sort
* if a staging is active but doesn't have a state yet, it should be
  considered pending not cancelled

closes #74
2019-03-04 12:11:34 +01:00
Xavier Morel
8ab72ce8d1 [FIX] runbot_merge: gap in PR names in awaiting list
Repeatedly fixed it live, but apparently still forgot to fix it in the
source.
2019-03-01 21:34:31 +01:00
Xavier Morel
13f843a165 [IMP] runbot_merge: adds direct links to CI details to the dashboard
Currently, if a staging is ongoing or failed one has to hunt for the
staging branches on the runbot dashboard in order to find out what
happens.

This adds a dropdown to the staging box/block providing direct status
and access to all the CI information whether the CI is ongoing or done,
successful or not.
2018-10-23 17:39:30 +02:00
Xavier Morel
2521ac8439 [IMP] runbot_merge: dashboard template
Forgotten code-port of direct UI changes
2018-10-17 11:31:07 +02:00
Xavier Morel
eef9ede686 [IMP] runbot_merge: dashboard template, add awaiting PRs 2018-10-16 13:15:00 +02:00
xmo-odoo
d042bc541f Better reporting of staging state
* [ADD] runbot_merge: more informative states to stagings on error

Currently, when a staging fails for other reasons than a CI failure:

* the staging having been cancelled is known implicitly, because the
  staging will be deactivated but will never get a status beyond
  pending (because it's not found when looking for it since it's not
  `active`)
* the fast-forward having failed is completely silent (logging aside),
  it looks for all the world like the staging succeeded

Timeout fails the PR already, but split-on-timeout was not so fix that
one bit.

* [FIX] odoo/odoo#cb2862ad2a60ff4ce66c14e7af2548fdf6fc5961

Closes #41