Old messages were quite inconsistent in their pinging of the PR author
and reviewer.
Reviewed messages (probably missed some but...) and try to more
consistently ping when the feedback requires some sort of action in
order to proceed.
Fixes#592
A few fixes and improvements after testing the feature:
- ensure the provisioned users are created as internal (not portal)
- assume oauth is installed and just crash if it's not
- handle a user not having an email (ignore)
- return value from json handler, otherwise JsonRequest sends no
payload which is *weird*
Stagings would be cancelled automatically if the PR's commits were
updated, but not if the target (base) was changed, even though that
has a drastic impact on staging.
Add hooks to unstage PRs if their base is updated, or if their message
is updated and relevant to staging (merge or rebase-merge methods).
Fixes#604
Extract the creation of a PR link (to github) as a dedicated
template for easier updates, and to use `display_name`
everywhere (instead of reimplementing it by name).
Also implement support for repo-level groups setting for information
hiding.
Fixes#590
When a staging's fast-forward (to the target branch) fails, the
mergebot would provide no useful information on the staging or the
dashboard.
This is because the reason was set to the HTTP status, which in case
of a fast-forward error is just "422 client error: unprocessable
entity".
Improve this by trying to parse github's response in that case, and
using the JSON error message as failure reason. This provides more
useful failure information like "update is not a fast forward",
"reference does not exist", or a branch protection failure.
Closes#591
- code in the various menus added over time through the UI (queues,
configuration, ...)
- update / improve PR layout a tick
- fix "outstanding forward ports" count on the dashboard
- improve hover title / help on dashboard
- add date of last modification (usually date of success / failure)
- make casing more coherent (everything lowercase)
- add explicit note that UTC date on staged at label is staged at datetime
- rediscover yet again that the staging information is when hovering
on the staging *except the staged at label*
- improve `PullRequest.unstage` to always insert the PR at the start of the
reason when cancelling the staging, for clarity / traceability
Closes#560, closes#609
New accounts endpoint such that the SSO can push new pre-configured
users / employees directly. This lowers maintenance burden.
Also remove one of the source partners from the merge test, as
ordering seems wonky for unclear reasons leading to random failures of
that test.
On #509, the rebasing process was changed to forcefully update the
commit date of the commits, in order to force trigger builds.
However when squashing was re-enabled for #539 for some fool reason it
implemented its own bespoke rebasing (despite that not actually saving
any API call that I can see), meaning it did *not* update the commit
date. As such, an old commit being squashed would not get picked up by
the runbot, which is what happened to odoo/documentation#1226 (which
ultimately had to be hand-rebased after some confusion as to why it
did not work).
Update `_stage_squash` to go through `rebase` the normal way, also
update `rebase` to pop the commit date entirely instead of setting it
manually, and update the squashing test to check that the commit date
gets properly updated.
Fixes#579, closes#582
Multiple fixes to various issues of the freeze wizard.
Some of the less fix-oriented sub-tasks were moved to #586 for discussion instead.
Closes#559, #587
Currently limited to release/freeze PRs: it can be difficult to be
sure the right PR was selected then, and a mistake there seems more
impactful than in the PRs being waited for?
Note: adds a test to make sure I don't break the check that all
release PRs must have the same label (be linked). This was
already safe, and in a way this PR adds convenience but not
really safety, but better sure than sorry.
- add flag to not select repos for freezing
- allow removing more repositories from the wizard
- when performing the freeze, only create branches for the selected
repos
The freeze wizard was implemented using a single action to open and
validate the dialog.
This was a mistake, as it means if there are no errors left (e.g. all
the PRs being waited for are now validated) trying to view the freeze
wizard will immediately validate it and commit the freeze, which is
unexpected, surprising, and unsafe e.g.
- open wizard
- add freeze prs
- add a required pr or two
- close and go do something else
- be told that more PRs need to be waited for
- reopen wizard
- oops freeze is done
So split the "open action" part of `action_freeze` into opening the
action and performing the freeze. The "freeze" / "view freeze" button
on the project only activates the latter, and the actual freeze
operation is only triggered from the wizard's "Freeze" button.
Part of #559.
Provides a less manual interface for creating the freeze:
* takes the name of the branch to create
* takes any number of PRs which must be part of the freeze
* takes PRs representing the HEADs of the new branches
Then essentially takes care of the test.
Implementation of the actual wizard is not trivial but fairly
straightforward and linear, biggest issue is not being able to
`project_id.branch_ids[1]` to get the new branch, not sure why but it
seems to ignore the ordering, clearing the cache doens't fix it.
When creating the branches, add a sleep after each one for secondary
rate limiting purposes. Same when deleting branches.
Also the forwardbot has been updated to disable the forwardport cron
while a freeze is ongoing, this simplifies the freezing process.
Note: after recommendation of @aab-odoo, tried using `_applyChanges`
in `_checkState` but it simply did not work: the two relational fields
got completely frozen and were impossible to update, which is less
than ideal. Oh well, hopefully it works well enough like this for now.
Could not reproduce it in a shell, but in the original version
`self.env.cr.rowcount` would always be 0 after the `modified`.
Turns out the check is really completely dumb, because if we got any
match in `select for update` we're going to find the same on in the
update, and thus the conditional is unnecessary. I've no idea why I
did that.
Anyway remove the conditional and just always try to unstage the PR.
To prep for the addition of the freeze wizard:
* move projects out of `pull_requests.py`
* then realize half the methods there have no relation to projects and
move them to more relevant places in `pull_requests.py`
* update corresponding crons (and tests using those crons) as the
methods have changed model, and the cron definitions thus need to be
updated
* split update to labels out of sending feedback comments while at it:
labels are not used much during tests so their manipulation can be
avoided; and labels are not as urgent as feedback so the crons can
be quite a bit slower
* move the project view out of `mergebot.xml` as well
Following #531 reviews from reviewers without an email set are
rejected.
For delegates this isn't very helpful, however for specifically
configured reviewers we can warn the configurer that they need to set
an email for things to work out.
* Adds a changelog page, linked from the main, with content
automatically loaded from the source. To avoid conflicts, each entry
is its own file and entries are grouped by the month during which
the update will (probably) be deployed
* The last group (most likely "last update") doesn't have a title, the
rest do.
* Add changelog entries from the last update so it's not too empty.
* Also update the layout for the alerts a bit: remove bottom margin to
reduce loss of whitespace.
When a commit is lacking the purpose (?) tag e.g. `[FIX]`, `[IMP]`,
..., a normal commit message of the form `<module>: <info>` marches
the looks of a git pseudo-header.
This results in a commit rewrite rejiggering the entire thing and
breaking the message by moving the title to the pseudo-headers and
mis-promoting either the `closes` line of body content to "title",
resulting in a really crappy commit message
e.g. odoo/odoo@d4aa9ad031.
Update the commit rewriting procedure to specifically skip the title
line, and re-inject it without processing in the output.
Fixes#540
Re-introduce a "squash" mode solely for the purpose of fixing up
commit messages without having to go and edit them: for now "squash"
only works for single-commit PRs, acts as a normal
integration (`rebase-ff`) *but* replaces the message of the commit
itself by that of the PR, similar to the `merge` modes.
This means maintainers can update commit messages to standards by
editing the PR description (though this is obviously sensible to
edition races with the original author).
Fixes#539
The list of outstanding forwardports was pretty messy as the ordering
was unclear and there was little way to really drill into the thing.
* Shows outstanding forward ports sorted by merged date ascending, the
oldest-merged PRs are the ones most in need of fixing while PRs
which were only just merged can safely be ignored.
* List reviewers with outstanding forward-ports, allow filtering by
clicking on their name, allow deseleting through the subtitle of the
page.
* Don't display reviewer in list when page is already filtered by
reviewer.
Also improve PR page a bit:
* Add reviewer.
* Add direct link to backend (closes#524).
Closes#529
Because only the first staging failure is considered "hard" and will
put the PR in error, when looking at staging logs it's possible to see
the same PR get staged over and over and over again, which is quite
confusing.
To make the logs less weird, always log a staging failure even when it
doesn't put the PR in error. Sadly this can't be tested as `capsys` is
not able to intercept an stderr inherited by a child process (capfd
doesn't work either).
Fixes#527
If a reviewer doesn't have an email set, the Signed-Off-By is an
`@users.noreply.github.com` address which just looks weird in the
final result.
Initially the thinking was that emails would be required for users to
*be* reviewers or self-reviewers, but since those are now o2ms / m2ms
it's a bit of a pain in the ass.
Instead, provide an action to easily try and fetch the public email of
a user from github.
Fixes#531
Since we have the model fields loaded up, we can just check into that
and assume anything that's not a field is a method.
That avoids having to go through `_call`, making things way less awkward.
After internal discussions it was concluded that this didn't extend
much more trust than allowing authors to accept their single-PR
commits without additional supervisions, and it would avoid some
inconveniences and PR-blocking.
Fixes#69 (nice)
Because sometimes github updates are missed (usually because github
never triggers it), it's possible for the mergebot's view of a PR
description to be incorrect. In that case, the PR may get merged with
the wrong merge message entirely, through no fault of the user.
Since we already fetch the PR info when staging it, there's very
little overhead to checking that the PR message we store is correct
then, and update it if it's not. This means the forward-port's
description should also be correct.
While at it, clean the forward port PR's creation a bit:
- there should always be a message since the title is required on
PRs (only the body can be missing), therefore no need to check that
- as we're adding a bunch of pseudo-headers, there always is a body,
no need for the condition
- inline the `pr_data` and `URL`: they were extracted for the support
of draft PRs, since that's been removed it's now unnecessary
Fixes#530
The page of PRs in "error" is currently kinda broken: it does not show
any feedback aside from the PR being in error which is not very
useful.
The intent was always to show an explanation, but when adding the page
I just deref'd `staging_id` which always fails though in two different
ways:
* when the PR can not be staged at all (because of a conflict) there
is no staging at all with a reason to show, so there should be
a fallback that the PR could not even be staged
* `staging_id` is a related field which deref's to the staging_ids
of the first *active* batch, except when a staging completes
(successfully or not) both staging and batch are disabled.
Plus the first batch will be the one for the first staging so if the
PR is retried and fails again the wrong reason may be displayed.
So update the section to show what we want: the reason of the
staging of the *last* batch attached to the PR.
NOTE: there's one failure mode remaining, namely if a staging fails
then on retry the PR conflicts with the new state of the
repository (so it can't be staged at all), the "reason" will
remain that of the staging. This could be mitigated by attaching
a "nonsense" batch on failure to stage (similar to the
forwardport stuff), that batch would have no staging, therefore
no staging reason, therefore fallback.
Closes#525
Draft was added in 82174ae66e but turns
out the v13 ORM is not able to create a required column (even when
given a default value), at least for booleans.
So create it by hand.
On staging failure, the 'bot would point to the first error or failure
status it found on the commit. This turns out not to be correct as
we (now) have various statuses which are optional, and may fail
without blocking stagings (either because they're solely informational
or because they're blocking & overridable on PRs).
Fix this so the 'bot points to the first *required* failure.
Fixes#517
* Remove the forwardport creating PRs in draft, that was mostly to
avoid codeowners triggering but we've removed the github one and
hand-rolled it, so not a concern anymore.
* Prevent merging `draft` PRs, the mergebot rejects approval on draft
PRs and insults people.
TBD (maybe): try to create *conflicting* forward-port PRs in draft so
it's clearer they need to be *fixed*? Issue of not being able to do
that on all private repositories remains so~~
Fixes#500
"Uniquifier" commits were introduced to ensure branches of a staging
on which nothing had been staged would still be rebuilt properly.
This means technically the branches on which something had been
staged never *needed* a uniquifier, strictly speaking. And those lead
to extra building, because once the actually staged PRs get pushed
from staging to their final destination it's an unknown commit to the
runbot, which needs to rebuild it instead of being able to just use
the staging it already has.
Thus only add the uniquifier where it *might* be necessary:
technically the runbot should not manage this use case much better,
however there are still issues like an ancillary build working with
the same branch tip (e.g. the "current master") and sending a failure
result which would fail the entire staging. The uniquifier guards
against this issue.
Also update rebase semantics to always update the *commit date* of the
rebased commits: this ensures the tip commit is always "recent" in the
case of a rebase-ff (which is common as that's what single-commit PRs
do), as the runbot may skip commits it considers "old".
Also update some of the utility methods around repos / commits to be
simpler, and avoid assuming the result is JSON-decodable (sometimes it
is not).
Also update the handling of commit statuses using postgres' ON
CONFLICT and jsonb support, hopefully this improves (or even fixes)
the serialization errors. Should be compatible with 9.5 onwards which
is *ancient* at this point.
Fixes#509
Although it's possible to find what PR a commit was part of with a bit
of `git log` magic (e.g. `--ancestry-path COMMIT.. --reverse`) it's
not the most convenient, and many people don't know about it, leading
them to various debatable decisions to try and mitigate the issue,
such as tagging every commit in a PR with the PR's identity, which
then leads github to spam the PR itself with pingbacks from its own
commits. Which is great.
Add this information to the commits when rebasing them (and *only*
when rebasing them), using a `Part-of:` pseudo-header.
Fixes#482
Proper attribution is important in general, but especially for
external contributors. Before this change, and the previous change
fixing authorship deduplication, it was rather easy for a "squashed"
conflict commit (attributed to the 'bot for lack of a really clean
option) to get merged by mistake.
This commit changes two things:
* The mergebot now refuses to stage commits without an email set, the
github API rejects those commits anyway so any integration mode
other than `merge` would fail, just with a very unclear error
* The forwardbot now creates commits with an empty author / committer
email when the pull request as a whole has multiple authors /
committers. This leverages the mergebot update.
Also clean up the staging process to provide richer error reporting
using bespoke exceptions instead of simple assertions. I'm not sure
we've ever encountered most of these errors so they're really sanity
checks but the old reporting would be... less than great.
Fixes#505
If a PR is closed on github and unknown by the mergebot, when fetched
it should be properly sync'd as "closed" in the backend, otherwise the
PR can get in a weird state and cause issues.
Also move the "I fetched the thing" comment before the actual creation
of the PR for workflow clarity, otherwise the reader has the
impression that the 'bot knew about the PR then fetched it anyway.
And improve savepoint management around the fetching: savepoints
should be released in all cases.
Closes#488.
If two PRs have the same label *in different projects entirely*, the
mergebot should not consider them to be linked, but it did as shown by
the warning message on odoo-dev/odoo#905 (two PRs created from the
same branch in different projects were seen as linked by the status
checker).
3b417b16a1 fixed the actual staging
selection, it's only the warning which did not properly segregate PRs.
Only group PRs which target the same branch (therefore are within the
same project).
Fixes#487
Previously, a PR's status page would only show the linked / related
PRs when `open`.
Since the relations between PRs remains useful, also make this
information available during staging and after merging.
Fixes#463
* in the main dashboard, show the exact UTC timestamp (with a Z
marker) on hover, not just the relative delta
* in the branch details page, show the full timestamp, zoned, in
ISO-8601 format
If a PR got merged to master (or whatever the current development
branch is), there's no easy way to know what maintenance branch it
ended up landing in, except by asking git which branches contain the
commit (which can be rather slow).
Add a special case on merge which labels the PR with a pseudo-branch
patterned after the second-to-last branch of the project:
* if the branch ends with a number, increment the number by one
e.g. 2.0 -> 2.1, 5 -> 5.1
* otherwise, just prefix with `post-` e.g. "maint" ->
"post-maint" (that one doesn't sound very helpful, but I guess it's
nice for the weirdoes who call their branches "natty narwhal" and
shit)
Fixes#450
5cf3617eef intended to create merge
messages with only the content of PR descriptions before the first
thematic break. However this processing was incorrectly applied
to all messages being processed (meaning rebased / squashed commit
messages as well).
Properly apply thematic break processing to only commit messages
created from PR descriptions.
Before this, we would "roughly" select stagings by looking at stagings
whose heads matched a specific sha then validating them all. This
could perform extra validations on stagings once in a while but this
was assumed not to be much an issue, at least originally.
However two changes later on have contributed to this likely being the
cause of #429 (stagings never timing out):
* heads of the staging branches are uniquifier commits stored in the
heads map, but the actual heads of the stagings are also stored
there, some of which are no-ops (hence the uniquifiers) so assuming
repos A and B, if a staging contains PRs touching A then the head of
B actual will also be a head of B
* when a staging is validated, if it *contains* any pending result the
timeout limit gets bumped back
The issue here is that if a success / failure status is lost (which
would be the most common reason for timeouts) *and* someone has forked
and is regularly rebuilding a branch-head used as-is by a staging,
each of those rebuilds will trigger a validation of the staging, which
will find that one of the statuses is still pending (because we missed
the success / failure), which will bump up the timeout limit,
continuing until the branch stops getting rebuilt.
This is probably one of the reasons why some stagings last for *way*
more than 2h, though it is far from explaining all of them: 90% of the
stagings lasting more than *3*h end up succeeding. Tho it's always
possible that this is because someone notices and resends a success
for the missing status it seems somewhat doubtful. Oh well.
Also fix the incorrect log call on `update_timeout_limit` triggering.